Gridcensus

Great Lakes

Industrial

Sullivan County, New Hampshire · ISO-NE

DC Readiness
50.1
Fair / 100

Great Lakes is an industrial datacenter candidate site in Sullivan County, New Hampshire, interconnecting through ISO-NE. It screens at 50.1/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityPUBLIC SERVICE CO OF NHinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth3
Avg queue wait3.9 yrs

Connectivity

Nearest IXPVELCO Rutland
IXP distance36.9 mi
Fiber providers9
Fiber coverage57.4%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterVELCO Rutland
DC distance36.9 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity15.53¢/kWh
Industrial electricity13.16¢/kWh
Cooling degree days400
Heating degree days7,200
Land price / acre$5,219

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Great Lakes

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
42
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
94
Natural hazard6%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Sullivan County, ranked by DC Readiness.

Sites near Great Lakes
SiteTypeVoltageCapacityQueue waitScore
TAP136051Substation-Adjacent115 kV100 MW3.9 yrs56.0
ASCUTNEYSubstation-Adjacent115 kV100 MW3.9 yrs55.0
ASCUTNEYSubstation-Adjacent115 kV100 MW3.9 yrs55.0
UNKNOWN136710Substation-Adjacent115 kV100 MW3.9 yrs54.9
Wheelabrator Claremont FacilityBrownfield—5 MW3.5 yrs54.1
OZ SullivanGreenfield——3.5 yrs53.0
Sawtooth BuildingIndustrial——3.9 yrs50.1
Topstone MillIndustrial——3.9 yrs50.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Great Lakes, Sullivan County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.