Bristol County, Massachusetts · ISO-NE

DC Readiness
41.4
Fair / 100

Lot 3 is a industrial datacenter candidate site in Bristol County, Massachusetts, interconnecting through ISO-NE. It screens at 41.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth32

Connectivity

Nearest IXPProv.net 935
IXP distance28.3 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterCrown Castle Providence (235 Promenade)
DC distance28.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity17.41¢/kWh
Industrial electricity16.54¢/kWh
Cooling degree days600
Heating degree days5,900
Land price / acre$21,221

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
26
Fiber connectivity12%
56
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Bristol County, ranked by DC Readiness.

Sites near Lot 3
SiteTypeVoltageCapacityQueue waitScore
HATHAWAY STREETSubstation-Adjacent115 kV100 MW3.5 yrs65.5
TAP135387Substation-Adjacent115 kV100 MW3.5 yrs64.8
TAUNTON TAPSubstation-Adjacent115 kV100 MW3.5 yrs64.2
Greenfield (BERRY STREET - FALL RIVER (345)Greenfield345 kV600 MW3.5 yrs62.6
SOMERSETSubstation-Adjacent115 kV100 MW3.5 yrs62.4
SYKES ROADSubstation-Adjacent115 kV100 MW3.5 yrs62.3
TAP135391Substation-Adjacent115 kV100 MW3.5 yrs61.9
TAP136647Substation-Adjacent115 kV100 MW3.5 yrs61.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Lot 3, Bristol County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.