Greenfield (BROOKRIDGE - UNKNOWN156846)
GreenfieldCitrus, Florida · SERC
At a glance
Greenfield (BROOKRIDGE - UNKNOWN156846) is a greenfield datacenter candidate site in Citrus, Florida, scoring 53.1/100 DC Readiness — 35th of 49 scored sites in the county. Its nearest substation is BROOKRIDGE. It sits in the SERC grid region and the DUKE ENERGY FLORIDA, LLC service territory, where interconnection has averaged 3.7 years from request to operation. GridCensus catalogs 300 MW of candidate capacity here.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
Site location
Get alerts
Track Greenfield (BROOKRIDGE - UNKNOWN156846)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Greenfield (BROOKRIDGE - UNKNOWN156846) compare with other sites in Citrus?
Greenfield (BROOKRIDGE - UNKNOWN156846) ranks 35th of 49 scored candidate sites in Citrus. Its 53.1/100 is roughly in line with the county average of 54.7. It is roughly in line with the Florida average of 56.0 and roughly in line with the national average of 53.2.
Against the Florida average, its strongest sub-score is power availability (50 vs 41) and its weakest is fiber connectivity (50 vs 73). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Greenfield (BROOKRIDGE - UNKNOWN156846) to power, fiber and other datacenters?
The nearest mapped substation, BROOKRIDGE, is the closest grid connection point on record and operates at 230 kV. For connectivity, the nearest internet exchange facility is Flexential - Tampa/North (TPA03) at 50.6 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Flexential Tampa - North, 50.6 miles away.
What are the flood, water and hazard risks at Greenfield (BROOKRIDGE - UNKNOWN156846)?
At the county level, FEMA's National Risk Index rates Citrus "Very High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| CRYSTAL RIVER | Substation-Adjacent | 500 kV | 1,000 MW | 3.7 yrs | 66.5 |
| TAP155704 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 60.3 |
| HOLDER | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 59.8 |
| UNKNOWN156846 | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 59.7 |
| EC Coal Citrus County | Greenfield | — | — | 3.7 yrs | 59.7 |
| Levy Nuclear Plant | Brownfield | — | 2,500 MW | 3.7 yrs | 58.9 |
| OZ Citrus | Greenfield | — | — | 3.7 yrs | 58.9 |
| EC Near Crystal River | Greenfield | — | — | 3.7 yrs | 58.5 |
Greenfield (BROOKRIDGE - UNKNOWN156846): common questions
What is the DC Readiness score of Greenfield (BROOKRIDGE - UNKNOWN156846)?
Greenfield (BROOKRIDGE - UNKNOWN156846) scores 53.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 35th of 49 scored sites in Citrus. The Citrus average is 54.7 and the Florida average is 56.0.
What is the nearest substation to Greenfield (BROOKRIDGE - UNKNOWN156846)?
The nearest mapped substation is BROOKRIDGE, at 230 kV. GridCensus catalogs 300 MW of candidate capacity for the site.
Which electric utility serves Greenfield (BROOKRIDGE - UNKNOWN156846)?
DUKE ENERGY FLORIDA, LLC (investor owned) holds the retail service territory that contains the site; its holding company is DUKE ENERGY CORP.
What grid region is Greenfield (BROOKRIDGE - UNKNOWN156846) in?
Greenfield (BROOKRIDGE - UNKNOWN156846) is in the SERC region. Projects interconnecting there have averaged a 3.7-year wait from queue request to operation.
How far is Greenfield (BROOKRIDGE - UNKNOWN156846) from an internet exchange?
The nearest internet exchange facility is Flexential - Tampa/North (TPA03), about 50.6 miles away; 9 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Greenfield (BROOKRIDGE - UNKNOWN156846), Citrus, FL”, https://gridcensus.com/datacenter-sites/florida/citrus/greenfield-brookridge-unknown156846-baa6c651 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Greenfield (BROOKRIDGE - UNKNOWN156846), Citrus is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.