Skip to content
Gridcensus

Levy Nuclear Plant

Brownfield

Citrus, Florida · SERC

DC Readiness
59.9
Good / 100

Levy Nuclear Plant is a brownfield datacenter candidate site in Citrus, Florida, interconnecting through SERC. It screens at 59.9/100 DC Readiness with a catalogued 2,500 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Available capacity2,500 MW
Utility commercial rate0.12¢/kWh
UtilityDUKE ENERGY FLORIDA, LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPFlexential - Tampa/North (TPA03)
IXP distance70.6 mi
Fiber providers9
Fiber coverage23.8%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance323.9 mi

Site characteristics

Site typeBrownfield
Land contactState Environmental Cleanup Program
Land owner typeprivate
Buildability75.0/100
Former usenuclear
Existing capacity2,500 MW

Risk & environment

Environmental constraintModerate (55/100)
Flood zoneZone A (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteRAYONIER FOREST RESOURCES L P LEVY COUNTY SITE
Hazard sub-score20/100
Construction cost index67.0 (avg 100)

Location context

Nearest datacenterUF Research Computing Center
DC distance45.7 mi
Nearest rail7.8 mi
Nearest gas pipeline3.6 mi
Nearest fiber route42.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,801

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Levy Nuclear Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
48
Speed to power20%
74
Fiber connectivity12%
34
Energy cost10%
89
Water risk7%
79
Natural hazard6%
20
Buildability7%
75
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
94
Gas pipeline2%
89
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.

Sites near Levy Nuclear Plant
SiteTypeVoltageCapacityQueue waitScore
CRYSTAL RIVERSubstation-Adjacent500 kV1,000 MW1.0 yrs67.4
TAP155704Substation-Adjacent230 kV300 MW1.0 yrs61.8
EC Coal Citrus CountyGreenfield——3.6 yrs61.4
HOLDERSubstation-Adjacent230 kV300 MW1.0 yrs61.4
UNKNOWN156846Substation-Adjacent230 kV300 MW1.0 yrs61.3
OZ CitrusGreenfield——3.6 yrs60.6
EC Near Crystal RiverGreenfield——3.6 yrs60.1
Greenfield (CENTRAL FLORIDA - UNKNOWN16215)Greenfield500 kV1,000 MW1.0 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Levy Nuclear Plant, Citrus. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.