Crsp, Navajo Unit at 37.020, -107.339

Federal Excess

Archuleta County, Colorado · SPP

DC Readiness
44.4
Fair / 100

At a glance

Crsp, Navajo Unit at 37.020, -107.339 is a federal excess datacenter candidate site in Archuleta County, Colorado, scoring 44.4/100 DC Readiness — 34th of 70 scored sites in the county. It sits in the SPP grid region and the LA PLATA ELECTRIC ASSN, INC service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

UtilityLA PLATA ELECTRIC ASSN, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth33
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXP2210Cortez LLC
IXP distance70.9 mi
Fiber providers3
Fiber coverage16.4%

Site characteristics

Acreage80 ac
Buildable load (est.)~32–80 MWland-based
Land contactArchuleta County County Assessor
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterJohn F. Simms Building
DC distance120.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.35¢/kWh
Industrial electricity7.89¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$4,985

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track CRSP, NAVAJO UNIT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Crsp, Navajo Unit at 37.020, -107.339 compare with other sites in Archuleta County?

Crsp, Navajo Unit at 37.020, -107.339 ranks 34th of 70 scored candidate sites in Archuleta County. Its 44.4/100 is roughly in line with the county average of 44.6. It is about 12% below the Colorado average of 50.6 and about 17% below the national average of 53.2.

Against the Colorado average, its strongest sub-score is speed to power (56 vs 53) and its weakest is fiber connectivity (29 vs 62). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Crsp, Navajo Unit at 37.020, -107.339 to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is 2210Cortez LLC at 70.9 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is John F. Simms Building, 120.8 miles away.

What are the flood, water and hazard risks at Crsp, Navajo Unit at 37.020, -107.339?

At the county level, FEMA's National Risk Index rates Archuleta County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
56
Fiber connectivity12%
29
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
61
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Archuleta County, ranked by DC Readiness.

Sites near Crsp, Navajo Unit at 37.020, -107.339
SiteTypeVoltageCapacityQueue waitScore
OZ ArchuletaGreenfield——4.3 yrs50.3
PAGOSASubstation-Adjacent115 kV100 MW4.3 yrs48.2
UNKNOWN203903Substation-Adjacent69 kV50 MW4.3 yrs46.2
SAN JUAN-CHAMAFederal Excess——4.3 yrs45.9
SAN JUAN-CHAMAFederal Excess——4.3 yrs45.8
SAN JUAN-CHAMAFederal Excess——4.3 yrs45.3
CRSP, NAVAJO UNITFederal Excess——4.3 yrs45.0
CRSP, NAVAJO UNITFederal Excess——4.3 yrs45.0

Crsp, Navajo Unit at 37.020, -107.339: common questions

What is the DC Readiness score of Crsp, Navajo Unit at 37.020, -107.339?

Crsp, Navajo Unit at 37.020, -107.339 scores 44.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 34th of 70 scored sites in Archuleta County. The Archuleta County average is 44.6 and the Colorado average is 50.6.

Which electric utility serves Crsp, Navajo Unit at 37.020, -107.339?

LA PLATA ELECTRIC ASSN, INC (cooperative) holds the retail service territory that contains the site.

What grid region is Crsp, Navajo Unit at 37.020, -107.339 in?

Crsp, Navajo Unit at 37.020, -107.339 is in the SPP region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

How far is Crsp, Navajo Unit at 37.020, -107.339 from an internet exchange?

The nearest internet exchange facility is 2210Cortez LLC, about 70.9 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Crsp, Navajo Unit at 37.020, -107.339, Archuleta County, CO”, https://gridcensus.com/datacenter-sites/colorado/archuleta-county/crsp-navajo-unit-d50eabb7 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Crsp, Navajo Unit at 37.020, -107.339, Archuleta County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.