Skip to content
Gridcensus

CRSP, NAVAJO UNIT

Federal Excess

Archuleta County, Colorado · SPP

DC Readiness
45.5
Fair / 100

CRSP, NAVAJO UNIT is a federal excess datacenter candidate site in Archuleta County, Colorado, interconnecting through SPP. It screens at 45.5/100 DC Readiness and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityLA PLATA ELECTRIC ASSN, INCcooperativemoderate to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth35
Avg queue wait3.3 yrs

Connectivity

Nearest IXPOso Grande Technologies
IXP distance140.2 mi
Fiber providers3
Fiber coverage16.4%

Site characteristics

Acreage125 ac
Buildable load (est.)~50–125 MWland-based
Former useReclamation and Irrigation

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterJohn F. Simms Building
DC distance125.1 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.35¢/kWh
Industrial electricity7.89¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$4,985

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track CRSP, NAVAJO UNIT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
33
Energy cost10%
50
Water risk7%
36
Natural hazard6%
75
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
67
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Archuleta County, ranked by DC Readiness.

Sites near CRSP, NAVAJO UNIT
SiteTypeVoltageCapacityQueue waitScore
OZ ArchuletaGreenfield——1.7 yrs51.6
PAGOSASubstation-Adjacent115 kV100 MW6.9 yrs48.3
UNKNOWN203903Substation-Adjacent69 kV50 MW6.9 yrs46.3
SAN JUAN-CHAMAFederal Excess——6.9 yrs46.0
SAN JUAN-CHAMAFederal Excess——6.9 yrs45.9
SAN JUAN-CHAMAFederal Excess——6.9 yrs45.4
CRSP, NAVAJO UNITFederal Excess——3.3 yrs45.4
CRSP, NAVAJO UNITFederal Excess——3.3 yrs45.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.