Greenfield (UNKNOWN300957 - UNKNOWN305477)

Greenfield

Nolan County, California · ERCOT

DC Readiness
53.6
Fair / 100

At a glance

Greenfield (UNKNOWN300957 - UNKNOWN305477) is a greenfield datacenter candidate site in Nolan County, California, scoring 53.6/100 DC Readiness — 32nd of 41 scored sites in the county. Its nearest substation is UNKNOWN300957. It sits in the ERCOT grid region, where interconnection has averaged 7.6 years from request to operation. GridCensus catalogs 600 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN300957
Substation voltage345 kV
Available capacity600 MW

Speed to power

Texas note: Since August 3, 2026, ERCOT has paused approvals to energize new datacenter and crypto-mining loads of 75 MW or more until a verification audit and a community impact review are complete; both reports are due to the Public Utility Commission of Texas by December 10, 2026. ERCOT speed-to-power scores here were set before the pause and do not reflect it. ERCOT board update.

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Fiber providers4
Fiber coverage55.1%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterDatacenter 1530966392
DC distance35.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.85¢/kWh
Industrial electricity7.14¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,581

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (UNKNOWN300957 - UNKNOWN305477)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (UNKNOWN300957 - UNKNOWN305477) compare with other sites in Nolan County?

Greenfield (UNKNOWN300957 - UNKNOWN305477) ranks 32nd of 41 scored candidate sites in Nolan County. Its 53.6/100 is roughly in line with the county average of 57.7. It is about 18% above the California average of 45.4 and roughly in line with the national average of 53.2.

Against the California average, its strongest sub-score is power availability (59 vs 36) and its weakest is natural hazard (45 vs 51). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (UNKNOWN300957 - UNKNOWN305477) to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN300957, is the closest grid connection point on record and operates at 345 kV. 4 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Datacenter 1530966392, 35.7 miles away.

What are the flood, water and hazard risks at Greenfield (UNKNOWN300957 - UNKNOWN305477)?

At the county level, FEMA's National Risk Index rates Nolan County "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power20%
58
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Nolan County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN300957 - UNKNOWN305477)
SiteTypeVoltageCapacityQueue waitScore
TXU Sweetwater Generating PlantBrownfield—344 MW3.5 yrs71.1
SWEETWATER EASTSubstation-Adjacent345 kV600 MW3.5 yrs64.7
UNKNOWN309410Substation-Adjacent345 kV600 MW3.5 yrs63.8
UNKNOWN308564Substation-Adjacent345 kV600 MW3.5 yrs63.7
UNKNOWN304972Substation-Adjacent345 kV600 MW3.5 yrs63.7
UNKNOWN306111Substation-Adjacent345 kV600 MW3.5 yrs63.7
UNKNOWN301908Substation-Adjacent345 kV600 MW3.5 yrs63.7
UNKNOWN302145Substation-Adjacent345 kV600 MW3.5 yrs63.5

Greenfield (UNKNOWN300957 - UNKNOWN305477): common questions

What is the DC Readiness score of Greenfield (UNKNOWN300957 - UNKNOWN305477)?

Greenfield (UNKNOWN300957 - UNKNOWN305477) scores 53.6/100 on the GridCensus DC Readiness scale, rated fair. It ranks 32nd of 41 scored sites in Nolan County. The Nolan County average is 57.7 and the California average is 45.4.

What is the nearest substation to Greenfield (UNKNOWN300957 - UNKNOWN305477)?

The nearest mapped substation is UNKNOWN300957, at 345 kV. GridCensus catalogs 600 MW of candidate capacity for the site.

What grid region is Greenfield (UNKNOWN300957 - UNKNOWN305477) in?

Greenfield (UNKNOWN300957 - UNKNOWN305477) is in the ERCOT region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (UNKNOWN300957 - UNKNOWN305477), Nolan County, CA”, https://gridcensus.com/datacenter-sites/california/nolan-county/greenfield-unknown300957-unknown305477-9b1c8c0d (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (UNKNOWN300957 - UNKNOWN305477), Nolan County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.