Skip to content
Gridcensus

UNKNOWN304972

Substation-Adjacent

Nolan County, Texas · ERCOT

DC Readiness
56.4
Good / 100

UNKNOWN304972 is a substation-adjacent datacenter candidate site in Nolan County, Texas, interconnecting through ERCOT. It screens at 56.4/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN304972
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait1.7 yrs

Connectivity

Fiber providers4
Fiber coverage55.1%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterDatacenter 1530966392
DC distance50.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.85¢/kWh
Industrial electricity7.14¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,581

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
63
Fiber connectivity12%
36
Energy cost10%
50
Water risk8%
44
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Nolan County, ranked by DC Readiness.

Sites near UNKNOWN304972
SiteTypeVoltageCapacityQueue waitScore
TXU Sweetwater Generating PlantBrownfield344 MW3.4 yrs68.4
EC Near TXU Sweetwater Generating PlantGreenfield3.4 yrs58.5
EC Near TXU Sweetwater Generating PlantGreenfield3.4 yrs58.3
EC Near TXU Sweetwater Generating PlantGreenfield3.4 yrs58.2
EC Near TXU Sweetwater Generating PlantGreenfield3.4 yrs57.3
EC Near TXU Sweetwater Generating PlantGreenfield3.4 yrs57.3
SWEETWATER EASTSubstation-Adjacent345 kV600 MW1.7 yrs57.2
EC Near TXU Sweetwater Generating PlantGreenfield3.4 yrs57.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN304972, Nolan County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.