Skip to content
Gridcensus

EC Near Altamont Gas Recovery

Greenfield

Alameda, California · CAISO

DC Readiness
50.3
Fair / 100

At a glance

EC Near Altamont Gas Recovery is a greenfield datacenter candidate site in Alameda, California, scoring 50.3/100 DC Readiness — 76th of 313 scored sites in the county. It sits in the CAISO grid region and the PACIFIC GAS & ELECTRIC CO. service territory, where interconnection has averaged 7.6 years from request to operation.

Power & interconnection

LMP zoneCAISO_NP15
Wholesale LMP$16.53/MWh
Utility commercial rate0.30¢/kWh
UtilityPACIFIC GAS & ELECTRIC CO.investor ownedrestrictive to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 8.3 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionCAISO
Queue depth227
Avg queue wait7.6 yrs
Recent queue wait8.3 yrs
Completion rate11%
Withdrawal rate89%

Connectivity

Nearest IXPHurricane Electric Fremont 1
IXP distance21.4 mi
Fiber providers12
Fiber coverage64.4%
Nearest cloud providerAWS
Nearest cloud regionus-west-1
Cloud region distance28.4 mi

Site characteristics

Site typeGreenfield
Land contactAlameda County Assessor
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub
Former usenear retired gas plant (5km)

Risk & environment

Environmental constraintModerate (55/100)
Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyPresent
Superfund siteAT T MOBILITY
Hazard sub-score22/100
Construction cost index111.5 (avg 100)

Location context

Nearest datacenterQES Computers
DC distance13.9 mi
Nearest rail2.5 mi
Nearest gas pipeline4.5 mi
Nearest fiber route150.8 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity29.86¢/kWh
Industrial electricity22.93¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$13,473

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Altamont Gas Recovery

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Altamont Gas Recovery compare with other sites in Alameda?

EC Near Altamont Gas Recovery ranks 76th of 313 scored candidate sites in Alameda. Its 50.3/100 is roughly in line with the county average of 49.4. It is about 11% above the California average of 45.4 and roughly in line with the national average of 53.2.

Against the California average, its strongest sub-score is water (47 vs 27) and its weakest is natural hazard (22 vs 51). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Altamont Gas Recovery to power, fiber and other datacenters?

The nearest located transmission bottleneck is 33916_CURTISS _115_33917_FBERBORD_115_BR_1 _1 (CAISO), 23 miles away. For connectivity, the nearest internet exchange facility is Hurricane Electric Fremont 1 at 21.4 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is QES Computers, 13.9 miles away.

What are the flood, water and hazard risks at EC Near Altamont Gas Recovery?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 3.80 on a 0–5 scale. No mapped wetlands are recorded on the parcel. The parcel overlaps designated critical habitat (California red-legged frog (Final)). A Superfund site is nearby (AT T MOBILITY). At the county level, FEMA's National Risk Index rates Alameda "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
43
Fiber connectivity12%
75
Energy cost10%
63
Water risk7%
47
Natural hazard6%
22
Buildability7%
70
Labor market4%
50
DC cluster4%
95
Land / acreage3%
34
Construction cost3%
57
Gas pipeline2%
85
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Alameda, ranked by DC Readiness.

Sites near EC Near Altamont Gas Recovery
SiteTypeVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfield500 kV1,322 MW7.6 yrs66.5
NEWARK DISTRIBUTIONSubstation-Adjacent230 kV300 MW7.6 yrs59.3
TESLASubstation-Adjacent500 kV1,000 MW7.6 yrs59.2
EASTSHORESubstation-Adjacent230 kV300 MW7.6 yrs58.7
LOS ESTEROSSubstation-Adjacent230 kV300 MW7.6 yrs58.6
FREMONTSubstation-Adjacent230 kV300 MW7.6 yrs58.4
Juniper Networks SunnyvaleBrownfield115 kV1 MW7.6 yrs58.1
CASTRO VALLEYSubstation-Adjacent230 kV300 MW7.6 yrs57.5

EC Near Altamont Gas Recovery: common questions

What is the DC Readiness score of EC Near Altamont Gas Recovery?

EC Near Altamont Gas Recovery scores 50.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 76th of 313 scored sites in Alameda. The Alameda average is 49.4 and the California average is 45.4.

Which electric utility serves EC Near Altamont Gas Recovery?

PACIFIC GAS & ELECTRIC CO. (investor owned) holds the retail service territory that contains the site; its holding company is PACIFIC GAS & ELECTRIC CORPORATION.

What grid region is EC Near Altamont Gas Recovery in?

EC Near Altamont Gas Recovery is in the CAISO region. Projects interconnecting there have averaged a 7.6-year wait from queue request to operation.

Is EC Near Altamont Gas Recovery in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near Altamont Gas Recovery?

Parcel records list the owner as PACIFIC GAS & ELECTRIC COMPANY (private land).

How far is EC Near Altamont Gas Recovery from an internet exchange?

The nearest internet exchange facility is Hurricane Electric Fremont 1, about 21.4 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Altamont Gas Recovery, Alameda, CA”, https://gridcensus.com/datacenter-sites/california/alameda/ec-near-altamont-gas-recovery-e8a3a2bc (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Altamont Gas Recovery, Alameda is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.