Datacenter Sites in Autauga, Alabama

Autauga has 56 scored datacenter candidate sites averaging 59.4/100 DC Readiness, with a catalogued aggregate of 4,700 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

56
Candidate sites
59.4/100
Avg DC Readiness
4,700 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Autauga

Site-selection context for Autauga

Yessales_tax_exemption
Datacenter tax incentive
14.28¢/kWh
Commercial electricity
10.22¢/kWh
Industrial electricity
4
Fiber providers
Low
Water stress
$2,636
Land price / acre
2,100
Cooling degree days
2,800
Heating degree days
63°F
Mean annual temp

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

By site type

Top datacenter sites in Autauga

Top datacenter sites in Autauga
SiteTypeVoltageCapacityQueue waitScore
AUTAUGAVILLESubstation-Adjacent500 kV1,000 MW1.0 yrs73.5
UNKNOWN133801Substation-Adjacent500 kV1,000 MW1.0 yrs69.3
CO LINE ROADSubstation-Adjacent230 kV300 MW1.0 yrs68.1
TAP142552Substation-Adjacent115 kV100 MW1.0 yrs64.2
UNKNOWN109235Substation-Adjacent115 kV100 MW1.0 yrs64.2
UNKNOWN109234Substation-Adjacent115 kV100 MW1.0 yrs64.2
TAP142549Substation-Adjacent115 kV100 MW1.0 yrs64.2
TAP145826Substation-Adjacent115 kV100 MW1.0 yrs64.2
UNKNOWN109233Substation-Adjacent115 kV100 MW1.0 yrs64.2
TAP145827Substation-Adjacent115 kV100 MW1.0 yrs64.2
UNKNOWN110895Substation-Adjacent115 kV100 MW1.0 yrs64.1
TAP145838Substation-Adjacent115 kV100 MW1.0 yrs64.1
UNKNOWN110903Substation-Adjacent115 kV100 MW1.0 yrs63.9
UNKNOWN110893Substation-Adjacent115 kV100 MW1.0 yrs63.6
EC Near E B Harris Electric Generating PlantGreenfield——3.7 yrs63.2
EC Near E B Harris Electric Generating PlantGreenfield——3.7 yrs62.8
UNKNOWN110897Substation-Adjacent115 kV100 MW1.0 yrs62.5
TAP142033Substation-Adjacent115 kV100 MW1.0 yrs62.4
TAP145978Substation-Adjacent115 kV100 MW1.0 yrs61.9
TAP142726Substation-Adjacent115 kV100 MW1.0 yrs60.6
UNKNOWN109188Substation-Adjacent115 kV100 MW1.0 yrs60.6
UNKNOWN109189Substation-Adjacent115 kV100 MW1.0 yrs60.5
UNKNOWN160843Substation-Adjacent115 kV100 MW1.0 yrs60.4
EC Near E B Harris Electric Generating PlantGreenfield——3.7 yrs60.4
EC Near E B Harris Electric Generating PlantGreenfield——3.7 yrs60.3

Autauga datacenter FAQ

How many datacenter sites are in Autauga?
56 scored datacenter candidate sites, averaging 59.4/100 DC Readiness.
Does Autauga offer datacenter tax incentives?
Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.
What is the natural-hazard risk in Autauga?
FEMA's National Risk Index rates Autauga as "Relatively High" (score 45).
What are industrial electricity rates in Autauga?
Average industrial electricity is 10.22¢/kWh and commercial is 14.28¢/kWh in Autauga.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Autauga, Alabama. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.