Fallon

Brownfield

NV, Churchill, Nevada · Sierra Pacific Power Co

Legacy capacity
2
MW

Fallon is a oil plant in NV, Churchill, Nevada, retired 1998-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date1998-12-01
EIA plant ID#6511

Grid hookup & remediation

Nearest substation17.0 mi
OperatorSierra Pacific Power Co
Operator addressn\a, NV, NV, 89406
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Fallon, ranked by DC Readiness.

Candidate sites near Fallon
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs60.8
SALT WELLS TAPSubstation-AdjacentNVChurchill County230 kV300 MW5.8 yrs60.6
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs60.3
FORT CHURCHILLSubstation-AdjacentNVLyon County230 kV300 MW5.8 yrs59.3
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVStorey County1000 kV1,000 MW5.8 yrs59.0
TAP307929Substation-AdjacentNVStorey County120 kV100 MW5.8 yrs57.0
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVLyon County1000 kV1,000 MW5.8 yrs56.6
SALT WELLSSubstation-AdjacentNVChurchill County230 kV300 MW5.8 yrs56.5

See all datacenter sites in Nevada

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fallon, NV, Churchill, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.