Skip to content
Gridcensus

Desert Peak Power Plant

Brownfield

Fernley, Lyon, Nevada · Ormat Nevada Inc

Legacy capacity
11
MW

Desert Peak Power Plant is a former geothermal site in Fernley, Lyon, Nevada, retired 2006-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 11 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer geothermal site
Site typeretired_plant
Existing capacity11 MW
Retirement date2006-05-01
EIA plant ID#10018

Grid hookup & remediation

Nearest substation0.1 mi
Operator address10750 I-80 East, Exit 65, Fernley, NV, 89406
Why this site is datacenter-attractive: a former geothermal site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Lyon County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)11,483
Construction employment1,082
Land value$3,107/acre
Datacenter tax incentivesales_tax_abatement

Power economics & interconnection

Commercial power rate5.83¢/kWh
Industrial power rate5.01¢/kWh
Load growth (FERC-714)2.3%

Water & cooling

Water stressExtremely High
Public water supply8.8 MGD
Industrial water use0.3 MGD
Cooling degree days2,000
Mean annual temp50°F

Hazard, flood & connectivity

FEMA risk index12.0 · Very Low
Fiber providers2 · 25% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Desert Peak Power Plant — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Bradyformer geothermal site264.2 mi—
Stillwater Facilityformer geothermal site2125.5 mi—
Lahontanoil plant221.0 mi—
Fallonoil plant221.3 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Desert Peak Power Plant

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Desert Peak Power Plant, ranked by DC Readiness.

Candidate sites near Desert Peak Power Plant
SiteTypeStateCountyVoltageCapacityQueue waitScore
Desert Peak Power PlantBrownfieldNVStorey County—11 MW5.8 yrs58.1
EC Near LahontanGreenfieldNVChurchill——5.8 yrs57.8
EC Near LahontanGreenfieldNVChurchill——5.8 yrs56.8
EC Near LahontanGreenfieldNVChurchill——5.8 yrs56.4
EC Near LahontanGreenfieldNVChurchill——5.8 yrs55.8
OZ LyonGreenfieldNVLyon——5.8 yrs55.5
EC Near FallonGreenfieldNVChurchill——5.8 yrs55.0
EC Near LahontanGreenfieldNVChurchill——5.8 yrs54.9

Nearby internet exchanges

See all datacenter sites in Nevada →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Desert Peak Power Plant, Fernley, Lyon, Nevada is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.