Stillwater Facility

Brownfield

Fallon, Churchill, Nevada · Ormat Stillwater LLC

Legacy capacity
21
MW

Stillwater Facility is a former geothermal site in Fallon, Churchill, Nevada, retired 2009-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 21 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer geothermal site
Site typeretired_plant
Existing capacity21 MW
Retirement date2009-01-01
EIA plant ID#50765

Grid hookup & remediation

Nearest substation17.5 mi
Operator address4785 Lawrence Lane, Fallon, NV, 89406
Why this site is datacenter-attractive: a former geothermal site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Churchill County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)6,991
Construction employment758
Land value$2,955/acre
Datacenter tax incentivesales_tax_abatement

Power economics & interconnection

Commercial power rate5.83¢/kWh
Industrial power rate5.01¢/kWh
Load growth (FERC-714)2.3%

Water & cooling

Water stressExtremely High
Public water supply3.3 MGD
Industrial water use0.0 MGD
Cooling degree days2,000
Mean annual temp50°F

Hazard, flood & connectivity

FEMA risk index12.0 · Very Low
Fiber providers2 · 69% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Stillwater Facility — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Desert Peak Power Plantformer geothermal site1125.5 mi—
Fallonoil plant213.6 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Stillwater Facility

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Stillwater Facility, ranked by DC Readiness.

Candidate sites near Stillwater Facility
SiteTypeStateCountyVoltageCapacityQueue waitScore
Desert Peak Power PlantBrownfieldNVStorey County—11 MW5.8 yrs59.0
SALT WELLSSubstation-AdjacentNVChurchill County230 kV300 MW6.9 yrs57.2
SALT WELLS TAPSubstation-AdjacentNVChurchill County230 kV300 MW6.9 yrs56.9
EC Near FallonGreenfieldNVChurchill——5.8 yrs56.7
EC Near LahontanGreenfieldNVChurchill——5.8 yrs56.6
EC Near FallonGreenfieldNVChurchill——5.8 yrs55.7
EC Near FallonGreenfieldNVChurchill——5.8 yrs55.4
EC Near FallonGreenfieldNVChurchill——5.8 yrs55.3

See all datacenter sites in Nevada →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Stillwater Facility, Fallon, Churchill, Nevada. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.