Stillwater Facility
BrownfieldFallon, Churchill, Nevada · Ormat Stillwater LLC
Stillwater Facility is a former geothermal site in Fallon, Churchill, Nevada, retired 2009-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 21 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Stillwater Facility, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SALT WELLS TAP | Substation-Adjacent | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 60.6 |
| SALT WELLS | Substation-Adjacent | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 56.5 |
| Greenfield (CONTROL - DIXIE VALLEY) | Greenfield | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 56.1 |
| Greenfield (AUSTIN - SALT WELLS TAP) | Greenfield | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 55.9 |
| Greenfield (AUSTIN - SALT WELLS TAP) | Greenfield | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 55.9 |
| Greenfield (CONTROL - DIXIE VALLEY) | Greenfield | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 55.7 |
| Greenfield (CONTROL - DIXIE VALLEY) | Greenfield | NV | Churchill County | 230 kV | 300 MW | 5.8 yrs | 55.6 |
| Greenfield (SALT WELLS TAP - FORT CHURCHIL) | Greenfield | NV | Lyon County | 230 kV | 300 MW | 5.8 yrs | 54.6 |
See all datacenter sites in Nevada →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.