Battle Mountain

Brownfield

Battle Mtn., Lander, Nevada · Sierra Pacific Power Co

Legacy capacity
8
MW

Battle Mountain is a oil plant in Battle Mtn., Lander, Nevada, retired 2011-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 8 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity8 MW
Retirement date2011-01-01
EIA plant ID#6509

Grid hookup & remediation

Nearest substation2.3 mi
OperatorSierra Pacific Power Co
Operator addressWest Front St., Battle Mtn., NV, 89820
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Battle Mountain, ranked by DC Readiness.

Candidate sites near Battle Mountain
SiteTypeStateCountyVoltageCapacityQueue waitScore
VALMYSubstation-AdjacentNVHumboldt County345 kV600 MW5.8 yrs63.8
LONE TREESubstation-AdjacentNVHumboldt County120 kV100 MW5.8 yrs58.6
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVHumboldt County345 kV600 MW5.8 yrs58.4
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVHumboldt County345 kV600 MW5.8 yrs57.8
T.S. POWERSubstation-AdjacentNVEureka County120 kV100 MW5.8 yrs57.7
Greenfield (VALMY - FALCON)GreenfieldNVLander County345 kV600 MW5.8 yrs57.5
BANNOCKSubstation-AdjacentNVLander County120 kV100 MW5.8 yrs56.3
Greenfield (COYOTE CREEK - VALMY)GreenfieldNVElko County345 kV600 MW5.8 yrs56.3

See all datacenter sites in Nevada

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.