TS Power Plant
BrownfieldBattle Mountain, Eureka, Nevada · Nevada Gold Energy, LLC
TS Power Plant is a oil plant in Battle Mountain, Eureka, Nevada. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 168 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near TS Power Plant, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COYOTE CREEK | Substation-Adjacent | NV | Elko County | 345 kV | 600 MW | 5.8 yrs | 60.4 |
| T.S. POWER | Substation-Adjacent | NV | Eureka County | 120 kV | 100 MW | 5.8 yrs | 57.7 |
| MAGGIE CREEK | Substation-Adjacent | NV | Elko County | 120 kV | 100 MW | 5.8 yrs | 57.3 |
| QUARY | Substation-Adjacent | NV | Elko County | 120 kV | 100 MW | 5.8 yrs | 57.0 |
| Greenfield (ROBINSON - FALCON) | Greenfield | NV | Eureka County | 345 kV | 600 MW | 5.8 yrs | 57.0 |
| BARRICK | Substation-Adjacent | NV | Elko County | 120 kV | 100 MW | 5.8 yrs | 56.4 |
| Greenfield (COYOTE CREEK - VALMY) | Greenfield | NV | Elko County | 345 kV | 600 MW | 5.8 yrs | 56.3 |
| TS Power Plant | Brownfield | NV | Eureka | — | 168 MW | — | 56.0 |
See all datacenter sites in Nevada →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.