Skip to content
Gridcensus

Evansville Avenue Landfill

Brownfield

Meriden, Connecticut

Legacy capacity
1
MW

Evansville Avenue Landfill is a former landfill site in Meriden, Connecticut. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer landfill site
Site typeepa_brownfield
Existing capacity1 MW
Acreage3 ac

Grid hookup & remediation

Nearest substation1.7 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former landfill site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Evansville Avenue Landfill — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Bridgeport Stationcoal plant58232.4 mi—
Devon Stationoil plant20727.9 mi—
Middletownoil plant6911.2 mi—
A L Pierceoil plant236.5 mi—
John Street 1, 3, 4 & 5oil plant76.7 mi—
Hartford CT Landfill (solar)former landfill site116.8 micleanup_complete
Derby Landfill Solarformer landfill site120.9 micleanup_complete
Middletown Landfill - Wiltonformer landfill site—7.3 micleanup_complete

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Evansville Avenue Landfill

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Evansville Avenue Landfill, ranked by DC Readiness.

Candidate sites near Evansville Avenue Landfill
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRIDGEPORT RESCOSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW3.9 yrs70.3
NEW HAVEN HARBORSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.9 yrs66.5
FROST BRIDGESubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.9 yrs66.2
TAP136499Substation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs66.1
MANCHESTERSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs65.9
NO. WALLSubstation-AdjacentCTLower Connecticut River Valley Planning Region345 kV600 MW3.9 yrs65.8
NORTH BLOOMFIELDSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs65.6
BARBOUR HILLSubstation-AdjacentCTCapitol Planning Region345 kV600 MW3.9 yrs65.5

Nearby internet exchanges

See all datacenter sites in Connecticut →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Evansville Avenue Landfill, Meriden, Connecticut. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.