Devon Station
BrownfieldMilford, New Haven, Connecticut · Devon Power LLC
Devon Station is a oil plant in Milford, New Haven, Connecticut, retired 2007-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 207 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Devon Station — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Bridgeport Station | coal plant | 582 | 4.8 mi | — |
| Port Jefferson | oil plant | 92 | 18.0 mi | — |
| Shepaug | oil plant | 49 | 19.1 mi | — |
| A L Pierce | oil plant | 23 | 21.8 mi | — |
| John Street 1, 3, 4 & 5 | oil plant | 7 | 21.6 mi | — |
| New Milford Gas Recovery | natural gas plant | 3 | 28.5 mi | — |
| Norwalk Hospital Plant | natural gas plant | 3 | 17.7 mi | — |
| Bridgeport Landfill | former landfill site | 2 | 4.8 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Devon Station
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Devon Station, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BRIDGEPORT RESCO | Substation-Adjacent | CT | Greater Bridgeport Planning Region | 345 kV | 600 MW | 3.9 yrs | 70.3 |
| NEW HAVEN HARBOR | Substation-Adjacent | CT | South Central Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 66.5 |
| PLUMTREE | Substation-Adjacent | CT | Western Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.8 |
| NO. WALL | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.8 |
| SOUTHINGTON | Substation-Adjacent | CT | Naugatuck Valley Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.4 |
| DEVON | Substation-Adjacent | CT | Greater Bridgeport Planning Region | 115 kV | 100 MW | 3.9 yrs | 63.6 |
| SHEPAUG | Substation-Adjacent | CT | Naugatuck Valley Planning Region | 115 kV | 100 MW | 3.9 yrs | 62.5 |
| UNKNOWN129212 | Substation-Adjacent | NY | Greater Bridgeport Planning Region | 138 kV | 100 MW | 4.9 yrs | 61.3 |
Nearby internet exchanges
- 1025ConnectWestbury, NY · 8 networks
- 501 Franklin AveGarden City, NY · 5 networks
- CyrusOne NorwalkNorwalk, CT · 3 networks
- Cloudpath CT19 (5 Landmark Sq)Stamford, CT · 2 networks
See all datacenter sites in Connecticut →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.