Derby Landfill Solar

Brownfield

Derby, Connecticut

Legacy capacity
1
MW

Derby Landfill Solar is a former landfill site in Derby, Connecticut. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer landfill site
Site typeepa_brownfield
Existing capacity1 MW
Acreage23 ac

Grid hookup & remediation

Nearest substation0.9 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former landfill site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Derby Landfill Solar — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Bridgeport Stationcoal plant58212.0 mi—
Devon Stationoil plant2078.2 mi—
Port Jeffersonoil plant9226.0 mi—
Shepaugoil plant4913.8 mi—
A L Pierceoil plant2315.4 mi—
John Street 1, 3, 4 & 5oil plant715.2 mi—
New Milford Gas Recoverynatural gas plant323.4 mi—
Norwalk Hospital Plantnatural gas plant323.1 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Derby Landfill Solar

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Derby Landfill Solar, ranked by DC Readiness.

Candidate sites near Derby Landfill Solar
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRIDGEPORT RESCOSubstation-AdjacentCTGreater Bridgeport Planning Region345 kV600 MW3.9 yrs70.3
NEW HAVEN HARBORSubstation-AdjacentCTSouth Central Connecticut Planning Region345 kV600 MW3.9 yrs66.5
FROST BRIDGESubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.9 yrs66.2
PLUMTREESubstation-AdjacentCTWestern Connecticut Planning Region345 kV600 MW3.9 yrs65.8
NO. WALLSubstation-AdjacentCTLower Connecticut River Valley Planning Region345 kV600 MW3.9 yrs65.8
SOUTHINGTONSubstation-AdjacentCTNaugatuck Valley Planning Region345 kV600 MW3.9 yrs65.4
LONG MOUNTAINSubstation-AdjacentCTDutchess County345 kV600 MW3.9 yrs64.5
DEVONSubstation-AdjacentCTGreater Bridgeport Planning Region115 kV100 MW3.9 yrs63.6

Nearby internet exchanges

See all datacenter sites in Connecticut →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Derby Landfill Solar, Derby, Connecticut. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.