Middletown
BrownfieldMiddletown, Middlesex, Connecticut · Middletown Power LLC
Middletown is a oil plant in Middletown, Middlesex, Connecticut, retired 1998-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 69 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Middletown — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| A L Pierce | oil plant | 23 | 15.2 mi | — |
| John Street 1, 3, 4 & 5 | oil plant | 7 | 15.3 mi | — |
| Evansville Avenue Landfill | former landfill site | 1 | 11.2 mi | cleanup_complete |
| Hartford CT Landfill (solar) | former landfill site | 1 | 15.6 mi | cleanup_complete |
| Middletown Landfill - Wilton | former landfill site | — | 4.0 mi | cleanup_complete |
| Middletown Landfill - Weston | former landfill site | — | 4.0 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Middletown
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Middletown, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| NEW HAVEN HARBOR | Substation-Adjacent | CT | South Central Connecticut Planning Region | 345 kV | 600 MW | 3.9 yrs | 66.5 |
| TAP136499 | Substation-Adjacent | CT | Capitol Planning Region | 345 kV | 600 MW | 3.9 yrs | 66.1 |
| MANCHESTER | Substation-Adjacent | CT | Capitol Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.9 |
| NO. WALL | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.8 |
| NORTH BLOOMFIELD | Substation-Adjacent | CT | Capitol Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.6 |
| BARBOUR HILL | Substation-Adjacent | CT | Capitol Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.5 |
| SOUTHINGTON | Substation-Adjacent | CT | Naugatuck Valley Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.4 |
| KLEEN | Substation-Adjacent | CT | Lower Connecticut River Valley Planning Region | 345 kV | 600 MW | 3.9 yrs | 65.2 |
Nearby internet exchanges
- Lightboard ★ MassachusettsSpringfield, MA · 7 networks
- Crown Castle Springfield (1 Federal)Springfield, MA · 4 networks
- Lightboard ★ New EnglandSpringfield, MA · 2 networks
- Lumen West HavenWest Haven, CT · 1 networks
See all datacenter sites in Connecticut →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.