San Jose, Santa Clara, California · Bloom Energy

Legacy capacity
1
MW

Xilinx San Jose is a natural gas plant in San Jose, Santa Clara, California, retired 2020-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity1 MW
Retirement date2020-09-01
EIA plant ID#58299

Grid hookup & remediation

Nearest substation1.8 mi
OperatorBloom Energy
Operator address2100 All Programmable Drive, San Jose, CA, 95124
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Santa Clara County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)1,025,254
IT / tech employment13,228
Construction employment51,935
Land value$13,303/acre

Power economics & interconnection

Commercial power rate28.22¢/kWh
Industrial power rate21.85¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply194.6 MGD
Industrial water use12.5 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers18 · 49% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Xilinx San Jose — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
SJ/SC WPCPnatural gas plant1212.6 mi—
Santa Clara Cogennatural gas plant87.7 mi—
Waste Management Tri-Cities LFGTEnatural gas plant517.1 mi—
City of Palo Altonatural gas plant416.0 mi—
University of California Santa Cruznatural gas plant318.9 mi—
SC 1 Data Center, Phase 2oil plant27.5 mi—
Extreme Via Del Oronatural gas plant18.2 mi—
Juniper Networks Sunnyvalenatural gas plant111.8 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Xilinx San Jose

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Xilinx San Jose, ranked by DC Readiness.

Candidate sites near Xilinx San Jose
SiteTypeStateCountyVoltageCapacityQueue waitScore
METCALF 1Substation-AdjacentCASanta Clara County500 kV1,000 MW8.2 yrs59.6
NEWARK DISTRIBUTIONSubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs57.4
Juniper Networks SunnyvaleBrownfieldCAAlameda County115 kV1 MW5.7 yrs56.7
S.L.A.C.Substation-AdjacentCASan Mateo County230 kV300 MW8.2 yrs56.0
EASTSHORESubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs55.9
Extreme San IgnacioBrownfieldCASanta Clara County115 kV1 MW5.7 yrs55.9
SC 1 Data Center, Phase 2BrownfieldCASanta Clara County60 kV2 MW5.7 yrs55.9
LOS ESTEROSSubstation-AdjacentCAAlameda County230 kV300 MW8.2 yrs55.8

Nearby internet exchanges

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Xilinx San Jose, San Jose, Santa Clara, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.