Mobile GT

Brownfield

Eureka, Humboldt, California · Pacific Gas & Electric Co.

Legacy capacity
40
MW

Mobile GT is a oil plant in Eureka, Humboldt, California, retired 2010-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 40 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity40 MW
Retirement date2010-09-01
EIA plant ID#6212

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressBuhne Pt. 1000 King Salmon Ave, Eureka, CA, 95503
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Humboldt County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)36,011
Construction employment2,498
Land value$4,578/acre

Power economics & interconnection

Commercial power rate29.51¢/kWh
Industrial power rate22.64¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply11.5 MGD
Industrial water use0.5 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers4 · 20% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Mobile GT — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Humboldt Baynatural gas plant1020.0 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Mobile GT

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Mobile GT, ranked by DC Readiness.

Candidate sites near Mobile GT
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUMBOLDT BAYSubstation-AdjacentCAHumboldt County115 kV100 MW8.2 yrs47.3
EC Near Humboldt BayGreenfieldCAHumboldt——5.7 yrs47.2
ARCATASubstation-AdjacentCAHumboldt County115 kV100 MW8.2 yrs46.1
HUMBOLDTSubstation-AdjacentCAHumboldt County115 kV100 MW8.2 yrs46.0
OZ HumboldtGreenfieldCAHumboldt——5.7 yrs44.8
EC Near Humboldt BayGreenfieldCAHumboldt——5.7 yrs44.7
EC Near Humboldt BayGreenfieldCAHumboldt——5.7 yrs44.4
RIO DELLSubstation-AdjacentCAHumboldt County69 kV50 MW8.2 yrs44.1

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mobile GT, Eureka, Humboldt, California. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.