Humboldt Bay
BrownfieldEureka, Humboldt, California · Pacific Gas & Electric Co.
Humboldt Bay is a natural gas plant in Eureka, Humboldt, California, retired 2010-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 102 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Humboldt Bay, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Humboldt Bay | Brownfield | CA | Humboldt | — | 102 MW | — | 51.8 |
| Mobile GT | Brownfield | CA | Humboldt | — | 40 MW | — | 50.3 |
| HUMBOLDT | Substation-Adjacent | CA | Humboldt County | 115 kV | 100 MW | 5.7 yrs | 49.8 |
| HUMBOLDT BAY | Substation-Adjacent | CA | Humboldt County | 115 kV | 100 MW | 5.7 yrs | 48.5 |
| EC Near Humboldt Bay | Greenfield | CA | Humboldt | — | — | 5.7 yrs | 46.9 |
| Greenfield (HUMBOLDT - BRIDGEVILLE) | Greenfield | CA | Humboldt County | 115 kV | 100 MW | 5.7 yrs | 45.8 |
| Greenfield (HUMBOLDT - BRIDGEVILLE) | Greenfield | CA | Humboldt County | 115 kV | 100 MW | 5.7 yrs | 44.9 |
| EC Near Humboldt Bay | Greenfield | CA | Humboldt | — | — | 5.7 yrs | 44.5 |
See all datacenter sites in California →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.