Skip to content
Gridcensus

TAP171632

Substation

Wisconsin · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
—
kV

At a glance

TAP171632 is an electric substation in Wisconsin on NORTHERN STATES POWER CO - WISCONSIN's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN132505 in Price County, with a DC Readiness score of 57/100.

TAP171632 is an electric transmission substation in Wisconsin, on NORTHERN STATES POWER CO - WISCONSIN's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Coordinates46.0117, -90.4470

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#173957—NORTHERN STATES POWER CO - WISCONSININ SERVICE26.0 mi
#173958—NORTHERN STATES POWER CO - WISCONSININ SERVICE4.1 mi
#173959—NORTHERN STATES POWER CO - WISCONSININ SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP171632, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP171632 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132505Substation-AdjacentWIPrice County115 kV100 MW4.3 yrs56.8
UNKNOWN132504Substation-AdjacentWIPrice County115 kV100 MW4.3 yrs56.6
TAP139527Substation-AdjacentWIPrice County115 kV100 MW4.3 yrs56.5
EC Near Northern States FlambeauGreenfieldWIPrice——4.3 yrs56.0
EC Near Northern States FlambeauGreenfieldWIPrice——4.3 yrs55.6
EC Near Northern States FlambeauGreenfieldWIPrice——4.3 yrs55.4
EC Near Northern States FlambeauGreenfieldWIPrice——4.3 yrs55.2
OZ PriceGreenfieldWIPrice——4.3 yrs54.3

Who owns the transmission lines at TAP171632?

The 3 connected lines listed above are owned by NORTHERN STATES POWER CO - WISCONSIN. Their combined recorded length is about 32.2 miles.

How do candidate sites near TAP171632 score?

The 8 highest-scoring candidate sites within about 25 miles range from 54 to 57 on the 0–100 DC Readiness scale. They fall in Price County, Price. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP171632 substation?

3 transmission lines terminate at or pass through TAP171632 in the HIFLD line data. Together the listed lines cover about 32.2 miles.

Who owns TAP171632 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP171632 belong to NORTHERN STATES POWER CO - WISCONSIN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP171632 substation located?

TAP171632 is in Wisconsin at 46.0117, -90.4470. The datacenter candidate sites closest to it are in Price County, Price.

Are there datacenter candidate sites near TAP171632 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP171632. The highest-scoring is UNKNOWN132505 at 57/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP171632 substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/tap171632-367b036a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP171632 substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.