At a glance

TAP170862 is a 69 kV electric substation in Wisconsin on NORTHERN STATES POWER CO - WISCONSIN's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is BRIGGS ROAD in La Crosse County, with a DC Readiness score of 64/100.

TAP170862 is an electric transmission substation in Wisconsin, on NORTHERN STATES POWER CO - WISCONSIN's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Coordinates43.9110, -91.2348

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16022769 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE1.6 mi
#16794769 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE8.6 mi
#17262869 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP170862, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP170862 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BRIGGS ROADSubstation-AdjacentWILa Crosse County345 kV600 MW4.3 yrs64.1
GENOASubstation-AdjacentWIHouston County161 kV100 MW4.3 yrs60.5
EC Coal Vernon CountyGreenfieldWIVernon County——4.3 yrs59.7
EC Coal La Crosse CountyGreenfieldWILa Crosse County——4.3 yrs59.5
EC Coal Vernon CountyGreenfieldWIVernon County——4.3 yrs59.5
EC Near GenoaGreenfieldWIVernon——4.3 yrs59.2
EC Coal Houston CountyGreenfieldMNHouston County——4.3 yrs58.5
EC Coal Houston CountyGreenfieldMNHouston County——4.3 yrs58.2

Who owns the transmission lines at TAP170862?

The 3 connected lines listed above are owned by NORTHERN STATES POWER CO - WISCONSIN. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 10.2 miles.

How do candidate sites near TAP170862 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 64 on the 0–100 DC Readiness scale. They fall in La Crosse County, Houston County, Vernon County, Vernon. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP170862 substation?

TAP170862 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP170862 is below the national midpoint.

How many transmission lines connect to TAP170862 substation?

3 transmission lines terminate at or pass through TAP170862 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 10.2 miles.

Who owns TAP170862 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP170862 belong to NORTHERN STATES POWER CO - WISCONSIN. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP170862 substation located?

TAP170862 is in Wisconsin at 43.9110, -91.2348. The datacenter candidate sites closest to it are in La Crosse County, Houston County, Vernon County.

Are there datacenter candidate sites near TAP170862 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP170862. The highest-scoring is BRIGGS ROAD at 64/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP170862 substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/tap170862-79871b0a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP170862 substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.