BRIGGS ROAD
Substation-AdjacentLa Crosse County, Wisconsin · MISO
BRIGGS ROAD is a substation-adjacent datacenter candidate site in La Crosse County, Wisconsin, interconnecting through MISO. It screens at 61.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in La Crosse County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal La Crosse County | Greenfield | — | — | 1.4 yrs | 61.8 |
| UNKNOWN131978 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| TAP139568 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| UNKNOWN131556 | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| COULEE AVE | Substation-Adjacent | 161 kV | 100 MW | 2.8 yrs | 55.0 |
| UNKNOWN144322 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| UNKNOWN131052 | Substation-Adjacent | 69 kV | 50 MW | 2.8 yrs | 54.7 |
| UPPER MIDWEST ENV SCIENCES CTR | Federal Excess | — | — | 2.8 yrs | 53.1 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for BRIGGS ROAD, La Crosse County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.