TAP159661
SubstationOklahoma · OKLAHOMA GAS & ELECTRIC CO
At a glance
TAP159661 is an electric transmission substation in Oklahoma, on OKLAHOMA GAS & ELECTRIC CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #161622 | 69 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 24.4 mi |
| #161623 | 69 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 0.1 mi |
| #161624 | 69 kV | OKLAHOMA GAS & ELECTRIC CO | IN SERVICE | 7.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP159661, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MUSKOGEE | Substation-Adjacent | OK | Muskogee County | 345 kV | 600 MW | 4.3 yrs | 67.0 |
| TAP148807 | Substation-Adjacent | OK | Muskogee County | 345 kV | 600 MW | 4.3 yrs | 64.5 |
| EC Near Muskogee | Greenfield | OK | Muskogee | — | — | 4.3 yrs | 61.8 |
| EC Near Muskogee | Greenfield | OK | Muskogee | — | — | 4.3 yrs | 61.6 |
| EC Near Muskogee | Greenfield | OK | Muskogee | — | — | 4.3 yrs | 61.4 |
| OZ Adair | Greenfield | OK | Adair | — | — | 4.3 yrs | 61.3 |
| FORT GIBSON | Substation-Adjacent | OK | Cherokee County | 161 kV | 100 MW | 4.3 yrs | 61.0 |
| UNKNOWN119166 | Substation-Adjacent | OK | Muskogee County | 161 kV | 100 MW | 4.3 yrs | 60.7 |
Who owns the transmission lines at TAP159661?
The 3 connected lines listed above are owned by OKLAHOMA GAS & ELECTRIC CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 31.9 miles.
How do candidate sites near TAP159661 score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 67 on the 0–100 DC Readiness scale. They fall in Muskogee County, Muskogee, Adair, Cherokee County. The Oklahoma average across 3,723 scored sites is 52.9. 1,344 of those Oklahoma sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP159661 substation?
TAP159661 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP159661 is below the national midpoint.
How many transmission lines connect to TAP159661 substation?
3 transmission lines terminate at or pass through TAP159661 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 31.9 miles.
Who owns TAP159661 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP159661 belong to OKLAHOMA GAS & ELECTRIC CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP159661 substation located?
TAP159661 is in Oklahoma at 35.4927, -94.9642. The datacenter candidate sites closest to it are in Muskogee County, Muskogee, Adair.
Are there datacenter candidate sites near TAP159661 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP159661. The highest-scoring is MUSKOGEE at 67/100. Across Oklahoma, the average DC Readiness score is 52.9.
More in Oklahoma
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP159661 substation, Oklahoma”, https://gridcensus.com/substations/oklahoma/tap159661-8f492d46 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP159661 substation, Oklahoma is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.