DC Readiness
60.9
Good / 100

FORT GIBSON is a substation-adjacent datacenter candidate site in Cherokee County, Oklahoma, interconnecting through SPP. It screens at 60.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFORT GIBSON
Nearest grid bottleneckTMP270_23432 · 125 km (SPP)
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityOKLAHOMA GAS & ELECTRIC COinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPLake Region Technology & Communications
IXP distance6.7 mi
Fiber providers5
Fiber coverage95.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score58/100

Location context

Nearest datacenterLake Region Technology & Communications
DC distance6.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.14¢/kWh
Industrial electricity9.32¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,676

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track FORT GIBSON

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
56
Fiber connectivity12%
91
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Cherokee County, ranked by DC Readiness.

Sites near FORT GIBSON
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN119184Substation-Adjacent161 kV100 MW3.3 yrs60.4
UNKNOWN119000Substation-Adjacent161 kV100 MW3.3 yrs59.6
UNKNOWN118448Substation-Adjacent161 kV100 MW3.3 yrs59.5
UNKNOWN119192Substation-Adjacent161 kV100 MW3.3 yrs59.4
TAP149396Substation-Adjacent161 kV100 MW3.3 yrs59.4
UNKNOWN119182Substation-Adjacent69 kV50 MW3.3 yrs59.0
UNKNOWN159669Substation-Adjacent69 kV50 MW3.3 yrs58.9
UNKNOWN119189Substation-Adjacent69 kV50 MW3.3 yrs58.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FORT GIBSON, Cherokee County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.