OZ Adair

Greenfield

Adair, Oklahoma · SPP

DC Readiness
61.7
Good / 100

OZ Adair is a greenfield datacenter candidate site in Adair, Oklahoma, interconnecting through SPP. It screens at 61.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckTEMP90_26027 · 140 km (SPP)
LMP zoneSPP_SOUTH
Wholesale LMP$15.62/MWh
Utility commercial rate0.12¢/kWh
UtilityNORTHEAST OKLAHOMA ELECTRIC COcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPLake Region Technology & Communications
IXP distance29.0 mi
Fiber providers7
Fiber coverage99.8%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance243.2 mi

Site characteristics

Site typeGreenfield
Land contactAdair County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteFORMER WAL MART STORE 81
Hazard sub-score48/100
Construction cost index57.1 (avg 100)

Location context

Nearest datacenterLake Region Technology & Communications
DC distance29.0 mi
Nearest rail0.9 mi
Nearest gas pipeline13.2 mi
Nearest fiber route82.2 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.14¢/kWh
Industrial electricity10.65¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,426

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Adair

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
58
Fiber connectivity12%
71
Energy cost10%
96
Water risk7%
78
Natural hazard6%
48
Buildability7%
90
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
100
Gas pipeline2%
58
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Adair, ranked by DC Readiness.

Sites near OZ Adair
SiteTypeVoltageCapacityQueue waitScore
WEST SILOAM SPRINGSSubstation-Adjacent161 kV100 MW3.3 yrs59.1
UNKNOWN118418Substation-Adjacent161 kV100 MW3.3 yrs58.4
SILOAM SPRINGSSubstation-Adjacent161 kV100 MW2.8 yrs57.6
UNKNOWN118421Substation-Adjacent69 kV50 MW3.3 yrs56.5
TAP159862Substation-Adjacent69 kV50 MW3.3 yrs56.3
UNKNOWN118416Substation-Adjacent69 kV50 MW3.3 yrs55.8
TAP149397Substation-Adjacent69 kV50 MW3.3 yrs55.8
UNKNOWN118417Substation-Adjacent69 kV50 MW3.3 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.