Skip to content
Gridcensus

UNKNOWN118417

Substation-Adjacent

Adair, Oklahoma · SPP

DC Readiness
55.7
Good / 100

UNKNOWN118417 is a substation-adjacent datacenter candidate site in Adair, Oklahoma, interconnecting through SPP. It screens at 55.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN118417
Nearest grid bottleneckTEMP90_26027 · 114 km (SPP)
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityNORTHEAST OKLAHOMA ELECTRIC COcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 3.3 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth118
Avg queue wait3.3 yrs

Connectivity

Nearest IXPOzarksGo Fayetteville
IXP distance24.7 mi
Fiber providers7
Fiber coverage99.8%

Site characteristics

Land contactAdair County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score58/100

Location context

Nearest datacenterOzarksGo Fayetteville
DC distance24.7 mi
County hazard (FEMA NRI)Relatively High (42)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.14¢/kWh
Industrial electricity10.65¢/kWh
Cooling degree days1,900
Heating degree days3,600
Land price / acre$3,426

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment; 5-year ad valorem tax exemption.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN118417

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
56
Fiber connectivity12%
77
Energy cost10%
50
Water risk7%
64
Natural hazard6%
58
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Adair, ranked by DC Readiness.

Sites near UNKNOWN118417
SiteTypeVoltageCapacityQueue waitScore
OZ AdairGreenfield3.5 yrs61.7
WEST SILOAM SPRINGSSubstation-Adjacent161 kV100 MW3.3 yrs59.1
UNKNOWN118418Substation-Adjacent161 kV100 MW3.3 yrs58.4
SILOAM SPRINGSSubstation-Adjacent161 kV100 MW2.8 yrs57.6
UNKNOWN118421Substation-Adjacent69 kV50 MW3.3 yrs56.5
TAP159862Substation-Adjacent69 kV50 MW3.3 yrs56.3
UNKNOWN118416Substation-Adjacent69 kV50 MW3.3 yrs55.8
TAP149397Substation-Adjacent69 kV50 MW3.3 yrs55.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN118417, Adair. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.