Skip to content
Gridcensus

WALTERS

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
161
kV

At a glance

WALTERS is a 161 kV electric substation in North Carolina on PROGRESS ENERGY CAROLINAS INC's transmission network, recorded in the HIFLD transmission dataset. 6 transmission lines connect to it. 64 of North Carolina's 106 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OZ Hamblen in Hamblen, with a DC Readiness score of 64/100.

WALTERS is an electric transmission substation in North Carolina, on PROGRESS ENERGY CAROLINAS INC's transmission network. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines6

Ownership

Line owner (most lines)PROGRESS ENERGY CAROLINAS INC
Coordinates35.7744, -83.0989

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#106901161 kVPROGRESS ENERGY CAROLINAS INC—0.0 mi
#143353161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE8.9 mi
#131496138 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE60.0 mi
#107792115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE22.9 mi
#120471115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.4 mi
#124924115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE9.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WALTERS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WALTERS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ HamblenGreenfieldTNHamblen——3.9 yrs64.0
UNKNOWN110046Substation-AdjacentNCJackson County161 kV100 MW5.3 yrs62.2
CHEROKEE DAMSubstation-AdjacentTNGrainger County161 kV100 MW3.9 yrs61.8
WHITE PINESubstation-AdjacentTNHamblen County161 kV100 MW3.9 yrs61.7
OZ GreeneGreenfieldTNGreene——3.9 yrs61.2
UNKNOWN116422Substation-AdjacentTNCocke County161 kV100 MW3.9 yrs60.9
OZ CockeGreenfieldTNCocke——3.9 yrs60.9
UNKNOWN110049Substation-AdjacentNCSwain County161 kV100 MW5.3 yrs60.5

How does WALTERS compare with other substations in North Carolina?

North Carolina has 3,209 substation records in HIFLD, of which 106 carry a station name; the rest are unnamed tap points, risers and line ends. 23 named substations in the state are in WALTERS's 115–229 kV band (22% of named stations). 64 sit in a higher band. 10 named substations in North Carolina operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 230 kV.

Who owns the transmission lines at WALTERS?

The 6 connected lines listed above are owned by PROGRESS ENERGY CAROLINAS INC, TENNESSEE VALLEY AUTHORITY, DUKE ENERGY PROGRESS - (NC). Line voltages range from 115 kV to 161 kV. Their combined recorded length is about 107.6 miles.

How do candidate sites near WALTERS score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 64 on the 0–100 DC Readiness scale. They fall in Hamblen, Jackson County, Grainger County, Hamblen County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is WALTERS substation?

WALTERS has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so WALTERS is above the national midpoint.

How many transmission lines connect to WALTERS substation?

6 transmission lines terminate at or pass through WALTERS in the HIFLD line data. The connected lines listed here run at 161 kV, 138 kV, 115 kV. Together the listed lines cover about 107.6 miles.

Who owns WALTERS substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at WALTERS belong to PROGRESS ENERGY CAROLINAS INC, and others to DUKE ENERGY PROGRESS - (NC), TENNESSEE VALLEY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is WALTERS substation located?

WALTERS is in North Carolina at 35.7744, -83.0989. The datacenter candidate sites closest to it are in Hamblen, Jackson County, Grainger County.

Are there datacenter candidate sites near WALTERS substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of WALTERS. The highest-scoring is OZ Hamblen at 64/100. Across North Carolina, the average DC Readiness score is 55.1.

Other 161 kV substations in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “WALTERS substation, North Carolina”, https://gridcensus.com/substations/north-carolina/walters-fc47c9de (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WALTERS substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.