TAP154867

Substation

North Carolina

Max voltage
115
kV

At a glance

TAP154867 is a 115 kV electric substation in North Carolina, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN111316 in Cleveland County, with a DC Readiness score of 71/100.

TAP154867 is an electric transmission substation in North Carolina. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates35.3468, -81.8969

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#121148115 kV—IN SERVICE0.2 mi
#129131115 kV—IN SERVICE1.3 mi
#167856115 kV—IN SERVICE8.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154867, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154867 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN111316Substation-AdjacentNCCleveland County500 kV1,000 MW5.3 yrs71.0
UNKNOWN111199Substation-AdjacentNCCleveland County500 kV1,000 MW5.3 yrs67.4
PEACH VALLEY TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.9 yrs65.9
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.9 yrs65.8
OZ SpartanburgGreenfieldSCSpartanburg——3.9 yrs65.4
SHELBY TIESubstation-AdjacentNCCleveland County230 kV300 MW5.3 yrs64.2
RIVERVIEW SWITCHING STATIONSubstation-AdjacentSCCherokee County230 kV300 MW3.9 yrs63.3
EC Coal Rutherford CountyGreenfieldNCRutherford County——5.3 yrs62.6

How do candidate sites near TAP154867 score?

The 8 highest-scoring candidate sites within about 25 miles range from 63 to 71 on the 0–100 DC Readiness scale. They fall in Cleveland County, Spartanburg County, Spartanburg, Cherokee County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP154867 substation?

TAP154867 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP154867 is at the national midpoint.

How many transmission lines connect to TAP154867 substation?

3 transmission lines terminate at or pass through TAP154867 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 10 miles.

Where is TAP154867 substation located?

TAP154867 is in North Carolina at 35.3468, -81.8969. The datacenter candidate sites closest to it are in Cleveland County, Spartanburg County, Spartanburg.

Are there datacenter candidate sites near TAP154867 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP154867. The highest-scoring is UNKNOWN111316 at 71/100. Across North Carolina, the average DC Readiness score is 55.1.

More in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP154867 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap154867-2d9ad4a4 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP154867 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.