At a glance

WEST BABYLON is a 69 kV electric substation in New York on LONG ISLAND POWER AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 343 of New York's 570 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is DUFFY AVENUE CONVERTER STATION in Nassau County, with a DC Readiness score of 70/100.

WEST BABYLON is an electric transmission substation in New York, on LONG ISLAND POWER AUTHORITY's transmission network. It is classified as distribution (69–115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines4

Ownership

Line owner (most lines)LONG ISLAND POWER AUTHORITY
Coordinates40.6948, -73.3519

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11017169 kVLONG ISLAND POWER AUTHORITY—0.2 mi
#11851769 kVLONG ISLAND POWER AUTHORITYIN SERVICE0.2 mi
#12839969 kVLONG ISLAND POWER AUTHORITYIN SERVICE4.0 mi
#14062969 kVLONG ISLAND POWER AUTHORITYIN SERVICE4.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEST BABYLON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEST BABYLON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DUFFY AVENUE CONVERTER STATIONSubstation-AdjacentNYNassau County500 kV1,000 MW4.3 yrs70.2
SHORE RDSubstation-AdjacentNYNassau County345 kV600 MW4.3 yrs68.8
EAST GARDEN CITYSubstation-AdjacentNYNassau County345 kV600 MW4.3 yrs67.6
NEWBRIDGE ROADSubstation-AdjacentNYNassau County345 kV600 MW4.3 yrs67.3
WATERSIDESubstation-AdjacentCTWestchester County115 kV100 MW4.3 yrs63.9
TAP141012Substation-AdjacentNYNassau County138 kV100 MW4.3 yrs63.3
SOUTH ENDSubstation-AdjacentCTWestchester County115 kV100 MW4.3 yrs63.3
TAP136414Substation-AdjacentCTWestern Connecticut Planning Region115 kV100 MW4.3 yrs63.3

How does WEST BABYLON compare with other substations in New York?

New York has 2,777 substation records in HIFLD, of which 570 carry a station name; the rest are unnamed tap points, risers and line ends. 80 named substations in the state are in WEST BABYLON's 69–114 kV band (14% of named stations). 343 sit in a higher band. 56 named substations in New York operate at 345 kV or above. The highest voltage recorded in the state is 765 kV, and the state median is 115 kV.

Who owns the transmission lines at WEST BABYLON?

The 4 connected lines listed above are owned by LONG ISLAND POWER AUTHORITY. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 9.2 miles.

How do candidate sites near WEST BABYLON score?

The 8 highest-scoring candidate sites within about 25 miles range from 63 to 70 on the 0–100 DC Readiness scale. They fall in Nassau County, Westchester County, Western Connecticut Planning Region. The New York average across 2,980 scored sites is 54. 844 of those New York sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is WEST BABYLON substation?

WEST BABYLON has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so WEST BABYLON is below the national midpoint.

How many transmission lines connect to WEST BABYLON substation?

4 transmission lines terminate at or pass through WEST BABYLON in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 9.2 miles.

Who owns WEST BABYLON substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at WEST BABYLON belong to LONG ISLAND POWER AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is WEST BABYLON substation located?

WEST BABYLON is in New York at 40.6948, -73.3519. The datacenter candidate sites closest to it are in Nassau County, Westchester County, Western Connecticut Planning Region.

Are there datacenter candidate sites near WEST BABYLON substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of WEST BABYLON. The highest-scoring is DUFFY AVENUE CONVERTER STATION at 70/100. Across New York, the average DC Readiness score is 54.

Other 69 kV substations in New York

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “WEST BABYLON substation, New York”, https://gridcensus.com/substations/new-york/west-babylon-7ecb40f2 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WEST BABYLON substation, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.