Westchester County, Connecticut · ISO-NE

DC Readiness
64.2
Good / 100

WATERSIDE is a substation-adjacent datacenter candidate site in Westchester County, Connecticut, interconnecting through ISO-NE. It screens at 64.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWATERSIDE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionISO-NE
Queue depth34
Avg queue wait3.9 yrs

Connectivity

Nearest IXPCloudpath CT19 (5 Landmark Sq)
IXP distance1.5 mi
Fiber providers9
Fiber coverage99.8%

Site characteristics

Former useoil
Existing capacity70 MW
Retirement date2006-02-01

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score65/100

Location context

Nearest datacenterCloudpath CT19 (5 Landmark Sq)
DC distance1.5 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity17.01¢/kWh
Industrial electricity22.07¢/kWh
Cooling degree days700
Heating degree days6,100
Land price / acre$11,506

Incentive detail: Excelsior Jobs Program tax credits; IDA property tax abatements (PILOT); Empire State Digital Gaming.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
45
Fiber connectivity12%
97
Energy cost10%
50
Water risk8%
90
Natural hazard8%
65
Buildability7%
60
Labor market4%
50
DC cluster4%
100
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Westchester County, ranked by DC Readiness.

Sites near WATERSIDE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN129188Substation-Adjacent345 kV600 MW4.9 yrs69.4
MILLWOODSubstation-Adjacent345 kV600 MW4.9 yrs69.1
PLEASENTVILLESubstation-Adjacent345 kV600 MW4.9 yrs69.0
OZ WestchesterGreenfield3.5 yrs63.4
SOUTH ENDSubstation-Adjacent115 kV100 MW3.9 yrs63.2
GLENBROOKSubstation-Adjacent115 kV100 MW3.9 yrs63.1
OZ WestchesterGreenfield3.5 yrs62.4
Mount Kisco Landfill SolarBrownfield345 kV1 MW4.9 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WATERSIDE, Westchester County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.