TERMINAL is an electric substation in Florida on FLORIDA POWER & LIGHT CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN120148 in Palm Beach County, with a DC Readiness score of 67/100.

TERMINAL is an electric transmission substation in Florida, on FLORIDA POWER & LIGHT CO's transmission network. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership

Line owner (most lines)FLORIDA POWER & LIGHT CO
StateFlorida
Coordinates26.7351, -80.0638

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#144699—FLORIDA POWER & LIGHT COIN SERVICE1.4 mi
#150263—FLORIDA POWER & LIGHT COIN SERVICE1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TERMINAL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TERMINAL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN120148Substation-AdjacentFLPalm Beach County230 kV300 MW3.7 yrs66.9
YAMATOSubstation-AdjacentFLPalm Beach County230 kV300 MW3.7 yrs66.9
CLINTMOORESubstation-AdjacentFLPalm Beach County230 kV300 MW3.7 yrs66.8
CORBETTSubstation-AdjacentFLPalm Beach County500 kV1,000 MW3.7 yrs66.5
BUTTSSubstation-AdjacentFLBroward County230 kV300 MW3.7 yrs66.2
Lake Worth LandfillBrownfieldFLPalm Beach—2 MW3.7 yrs66.1
DELMARSubstation-AdjacentFLBroward County230 kV300 MW3.7 yrs66.1
HAMLETSubstation-AdjacentFLPalm Beach County230 kV300 MW3.7 yrs65.9

Who owns the transmission lines at TERMINAL?

The 2 connected lines listed above are owned by FLORIDA POWER & LIGHT CO. Their combined recorded length is about 2.7 miles.

How do candidate sites near TERMINAL score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 67 on the 0–100 DC Readiness scale. They fall in Palm Beach County, Broward County, Palm Beach. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TERMINAL substation?

2 transmission lines terminate at or pass through TERMINAL in the HIFLD line data. Together the listed lines cover about 2.7 miles.

Who owns TERMINAL substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TERMINAL belong to FLORIDA POWER & LIGHT CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TERMINAL substation located?

TERMINAL is in Florida at 26.7351, -80.0638. The datacenter candidate sites closest to it are in Palm Beach County, Broward County, Palm Beach.

Are there datacenter candidate sites near TERMINAL substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TERMINAL. The highest-scoring is UNKNOWN120148 at 67/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TERMINAL substation, Florida”, https://gridcensus.com/substations/florida/terminal-5cbd5588 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TERMINAL substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.