Skip to content
Gridcensus

MORGAN HENDERSON

Substation

Florida · FLORIDA POWER & LIGHT CO

Max voltage
—
kV

At a glance

MORGAN HENDERSON is an electric substation in Florida on FLORIDA POWER & LIGHT CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is FISHEATING CREEK in Highlands County, with a DC Readiness score of 59/100.

MORGAN HENDERSON is an electric transmission substation in Florida, on FLORIDA POWER & LIGHT CO's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)FLORIDA POWER & LIGHT CO
StateFlorida
Coordinates27.2088, -81.3332

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#109995——IN SERVICE15.5 mi
#127149—FLORIDA POWER & LIGHT COIN SERVICE20.4 mi
#140530——IN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MORGAN HENDERSON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MORGAN HENDERSON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FISHEATING CREEKSubstation-AdjacentFLHighlands County230 kV300 MW3.7 yrs59.4
EC Near Avon ParkGreenfieldFLHighlands——3.7 yrs59.3
AVON PARKSubstation-AdjacentFLHighlands County230 kV300 MW3.7 yrs59.1
EC Near PhillipsGreenfieldFLHighlands——3.7 yrs58.6
EC Near Dinner LakeGreenfieldFLHighlands——3.7 yrs58.5
EC Near Avon ParkGreenfieldFLHighlands——3.7 yrs57.7
OZ HardeeGreenfieldFLHardee——3.7 yrs57.4
EC Near PhillipsGreenfieldFLHighlands——3.7 yrs57.1

Who owns the transmission lines at MORGAN HENDERSON?

The 3 connected lines listed above are owned by FLORIDA POWER & LIGHT CO. Their combined recorded length is about 35.9 miles.

How do candidate sites near MORGAN HENDERSON score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 59 on the 0–100 DC Readiness scale. They fall in Highlands County, Highlands, Hardee. The Florida average across 4,344 scored sites is 56. 1,539 of those Florida sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to MORGAN HENDERSON substation?

3 transmission lines terminate at or pass through MORGAN HENDERSON in the HIFLD line data. Together the listed lines cover about 35.9 miles.

Who owns MORGAN HENDERSON substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at MORGAN HENDERSON belong to FLORIDA POWER & LIGHT CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is MORGAN HENDERSON substation located?

MORGAN HENDERSON is in Florida at 27.2088, -81.3332. The datacenter candidate sites closest to it are in Highlands County, Highlands, Hardee.

Are there datacenter candidate sites near MORGAN HENDERSON substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of MORGAN HENDERSON. The highest-scoring is FISHEATING CREEK at 59/100. Across Florida, the average DC Readiness score is 56.

More in Florida

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “MORGAN HENDERSON substation, Florida”, https://gridcensus.com/substations/florida/morgan-henderson-0257c6d7 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MORGAN HENDERSON substation, Florida is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.