TAP310768
SubstationCalifornia · AZUSA LIGHT & POWER
At a glance
TAP310768 is an electric transmission substation in California, on AZUSA LIGHT & POWER's transmission network. It is classified as distribution (<69 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #307510 | 66 kV | AZUSA LIGHT & POWER | IN SERVICE | 0.4 mi |
| #311211 | 66 kV | SOUTHERN CALIFORNIA EDISON | IN SERVICE | 10.4 mi |
| #312507 | 66 kV | AZUSA LIGHT & POWER | IN SERVICE | 3.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP310768, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| STATION E (TOLUCA) | Substation-Adjacent | CA | Los Angeles County | 500 kV | 1,000 MW | 7.6 yrs | 62.6 |
| Broadway (CA) | Brownfield | CA | Los Angeles County | 66 kV | 167 MW | 7.6 yrs | 62.4 |
| STATION M(VALLEY) | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 7.6 yrs | 61.7 |
| AIRWAY | Substation-Adjacent | CA | Los Angeles County | 230 kV | 300 MW | 7.6 yrs | 61.3 |
| RINALDI | Substation-Adjacent | CA | Los Angeles County | 500 kV | 1,000 MW | 7.6 yrs | 60.9 |
| VINCENT | Substation-Adjacent | CA | Los Angeles County | 500 kV | 1,000 MW | 7.6 yrs | 59.8 |
| UCLA So Campus Cogen Project | Brownfield | CA | Los Angeles County | 230 kV | 15 MW | 7.6 yrs | 58.9 |
| Magnolia | Brownfield | CA | Los Angeles County | 66 kV | 88 MW | 7.6 yrs | 58.8 |
Who owns the transmission lines at TAP310768?
The 3 connected lines listed above are owned by AZUSA LIGHT & POWER, SOUTHERN CALIFORNIA EDISON. Line voltages range from 66 kV to 66 kV. Their combined recorded length is about 14.2 miles.
How do candidate sites near TAP310768 score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Los Angeles County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP310768 substation?
TAP310768 has a maximum voltage of 66 kV. That places it in the below 69 kV band. The median named US substation in this dataset is 115 kV, so TAP310768 is below the national midpoint.
How many transmission lines connect to TAP310768 substation?
3 transmission lines terminate at or pass through TAP310768 in the HIFLD line data. The connected lines listed here run at 66 kV. Together the listed lines cover about 14.2 miles.
Who owns TAP310768 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP310768 belong to AZUSA LIGHT & POWER, and others to SOUTHERN CALIFORNIA EDISON. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP310768 substation located?
TAP310768 is in California at 34.4134, -118.4574. The datacenter candidate sites closest to it are in Los Angeles County.
Are there datacenter candidate sites near TAP310768 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310768. The highest-scoring is STATION E (TOLUCA) at 63/100. Across California, the average DC Readiness score is 45.4.
More in California
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP310768 substation, California”, https://gridcensus.com/substations/california/tap310768-f5800ebe (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP310768 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.