Skip to content
Gridcensus

TAP310554

Substation

California · SOUTHERN CALIFORNIA EDISON

Max voltage
115
kV

At a glance

TAP310554 is a 115 kV electric substation in California on SOUTHERN CALIFORNIA EDISON's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is DEVERS in Riverside County, with a DC Readiness score of 58/100.

TAP310554 is an electric transmission substation in California, on SOUTHERN CALIFORNIA EDISON's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)SOUTHERN CALIFORNIA EDISON
Coordinates33.8019, -116.4063

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#302303115 kVSOUTHERN CALIFORNIA EDISONIN SERVICE3.2 mi
#313917115 kVSOUTHERN CALIFORNIA EDISONIN SERVICE3.2 mi
#313922115 kVSOUTHERN CALIFORNIA EDISONIN SERVICE4.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP310554, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP310554 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEVERSSubstation-AdjacentCARiverside County500 kV1,000 MW7.6 yrs57.7
UNKNOWN307724Substation-AdjacentCARiverside County230 kV300 MW7.6 yrs53.2
MIRAGESubstation-AdjacentCARiverside County230 kV300 MW7.6 yrs53.2
COACHELLA VALLEYSubstation-AdjacentCARiverside County230 kV300 MW7.6 yrs53.1
OZ RiversideGreenfieldCARiverside——7.6 yrs51.5
OZ RiversideGreenfieldCARiverside——7.6 yrs51.2
CABEZONSubstation-AdjacentCARiverside County115 kV100 MW7.6 yrs50.5
ARROWHEADSubstation-AdjacentCARiverside County115 kV100 MW7.6 yrs50.3

Who owns the transmission lines at TAP310554?

The 3 connected lines listed above are owned by SOUTHERN CALIFORNIA EDISON. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 11.2 miles.

How do candidate sites near TAP310554 score?

The 8 highest-scoring candidate sites within about 25 miles range from 50 to 58 on the 0–100 DC Readiness scale. They fall in Riverside County, Riverside. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP310554 substation?

TAP310554 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP310554 is at the national midpoint.

How many transmission lines connect to TAP310554 substation?

3 transmission lines terminate at or pass through TAP310554 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 11.2 miles.

Who owns TAP310554 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP310554 belong to SOUTHERN CALIFORNIA EDISON. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP310554 substation located?

TAP310554 is in California at 33.8019, -116.4063. The datacenter candidate sites closest to it are in Riverside County, Riverside.

Are there datacenter candidate sites near TAP310554 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP310554. The highest-scoring is DEVERS at 58/100. Across California, the average DC Readiness score is 45.4.

More in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP310554 substation, California”, https://gridcensus.com/substations/california/tap310554-03865b9b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP310554 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.