RIO HONDO

Substation

California · AZUSA LIGHT & POWER

Max voltage
230
kV

At a glance

RIO HONDO is a 230 kV electric substation in California on AZUSA LIGHT & POWER's transmission network, recorded in the HIFLD transmission dataset. 8 transmission lines connect to it. 44 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is STATION E (TOLUCA) in Los Angeles County, with a DC Readiness score of 63/100.

RIO HONDO is an electric transmission substation in California, on AZUSA LIGHT & POWER's transmission network. It is classified as high-voltage (230 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage66 kV
Voltage classHigh-voltage (230 kV)
Connected lines8

Ownership

Line owner (most lines)AZUSA LIGHT & POWER
Coordinates34.1057, -117.9802

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#313782500 kVSOUTHERN CALIFORNIA EDISONIN SERVICE32.2 mi
#311321230 kV—IN SERVICE11.0 mi
#313781230 kVSOUTHERN CALIFORNIA EDISONIN SERVICE32.5 mi
#304003230 kV—IN SERVICE15.9 mi
#30890966 kVAZUSA LIGHT & POWERIN SERVICE5.5 mi
#30631666 kVAZUSA LIGHT & POWERIN SERVICE0.7 mi
#30047066 kVAZUSA LIGHT & POWER—1.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RIO HONDO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RIO HONDO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STATION E (TOLUCA)Substation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs62.6
Broadway (CA)BrownfieldCALos Angeles County66 kV167 MW7.6 yrs62.4
AIRWAYSubstation-AdjacentCALos Angeles County230 kV300 MW7.6 yrs61.3
HAYNESSubstation-AdjacentCAOrange County230 kV300 MW7.6 yrs60.9
SERRANOSubstation-AdjacentCAOrange County500 kV1,000 MW7.6 yrs60.8
VINCENTSubstation-AdjacentCALos Angeles County500 kV1,000 MW7.6 yrs59.8
FUELSubstation-AdjacentCAOrange County230 kV300 MW7.6 yrs59.8
Anaheim GTBrownfieldCAOrange County66 kV49 MW7.6 yrs59.0

How does RIO HONDO compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 384 named substations in the state are in RIO HONDO's 230–344 kV band (13% of named stations). 44 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at RIO HONDO?

The 7 connected lines listed above are owned by SOUTHERN CALIFORNIA EDISON, AZUSA LIGHT & POWER. Line voltages range from 66 kV to 500 kV. Their combined recorded length is about 99.5 miles.

How do candidate sites near RIO HONDO score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Los Angeles County, Orange County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is RIO HONDO substation?

RIO HONDO has a maximum voltage of 230 kV and a minimum of 66 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so RIO HONDO is above the national midpoint.

How many transmission lines connect to RIO HONDO substation?

8 transmission lines terminate at or pass through RIO HONDO in the HIFLD line data. The connected lines listed here run at 500 kV, 230 kV, 66 kV. Together the listed lines cover about 99.5 miles.

Who owns RIO HONDO substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at RIO HONDO belong to AZUSA LIGHT & POWER, and others to SOUTHERN CALIFORNIA EDISON. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is RIO HONDO substation located?

RIO HONDO is in California at 34.1057, -117.9802. The datacenter candidate sites closest to it are in Los Angeles County, Orange County.

Are there datacenter candidate sites near RIO HONDO substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of RIO HONDO. The highest-scoring is STATION E (TOLUCA) at 63/100. Across California, the average DC Readiness score is 45.4.

Other 230 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “RIO HONDO substation, California”, https://gridcensus.com/substations/california/rio-hondo-6038f3b4 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for RIO HONDO substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.