RIO DELL

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
69
kV

At a glance

RIO DELL is a 69 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 1,125 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is HUMBOLDT BAY in Humboldt County, with a DC Readiness score of 48/100.

RIO DELL is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates40.4954, -124.0993

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30251160 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.2 mi
#30906560 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE0.0 mi
#31189360 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE5.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RIO DELL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RIO DELL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HUMBOLDT BAYSubstation-AdjacentCAHumboldt County115 kV100 MW7.6 yrs47.6
EC Near Humboldt BayGreenfieldCAHumboldt——7.6 yrs47.2
ARCATASubstation-AdjacentCAHumboldt County115 kV100 MW7.6 yrs46.7
BRIDGEVILLESubstation-AdjacentCAHumboldt County115 kV100 MW7.6 yrs46.6
HUMBOLDTSubstation-AdjacentCAHumboldt County115 kV100 MW7.6 yrs46.5
OZ HumboldtGreenfieldCAHumboldt——7.6 yrs44.8
EC Near Humboldt BayGreenfieldCAHumboldt——7.6 yrs44.7
PACIFIC LUMBERSubstation-AdjacentCAHumboldt County69 kV50 MW7.6 yrs44.7

How does RIO DELL compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 379 named substations in the state are in RIO DELL's 69–114 kV band (13% of named stations). 1,125 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at RIO DELL?

The 3 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 60 kV. Their combined recorded length is about 6.5 miles.

How do candidate sites near RIO DELL score?

The 8 highest-scoring candidate sites within about 25 miles range from 45 to 48 on the 0–100 DC Readiness scale. They fall in Humboldt County, Humboldt. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is RIO DELL substation?

RIO DELL has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so RIO DELL is below the national midpoint.

How many transmission lines connect to RIO DELL substation?

1 transmission line terminate at or pass through RIO DELL in the HIFLD line data. The connected lines listed here run at 60 kV. Together the listed lines cover about 6.5 miles.

Who owns RIO DELL substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at RIO DELL belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is RIO DELL substation located?

RIO DELL is in California at 40.4954, -124.0993. The datacenter candidate sites closest to it are in Humboldt County, Humboldt.

Are there datacenter candidate sites near RIO DELL substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of RIO DELL. The highest-scoring is HUMBOLDT BAY at 48/100. Across California, the average DC Readiness score is 45.4.

Other 69 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “RIO DELL substation, California”, https://gridcensus.com/substations/california/rio-dell-0183c909 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for RIO DELL substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.