LAKEVIEW
SubstationCalifornia
At a glance
LAKEVIEW is an electric transmission substation in California. It is classified as sub-transmission (115 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
No owner is recorded for the lines that connect here.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of LAKEVIEW, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| VALLEY | Substation-Adjacent | CA | Orange County | 500 kV | 1,000 MW | 7.6 yrs | 62.3 |
| INLAND EMPIRE | Substation-Adjacent | CA | Orange County | 500 kV | 1,000 MW | 7.6 yrs | 62.3 |
| SAN BERNARDINO | Substation-Adjacent | CA | Orange County | 500 kV | 1,000 MW | 7.6 yrs | 60.2 |
| LINDE | Substation-Adjacent | CA | Orange County | 500 kV | 1,000 MW | 7.6 yrs | 58.9 |
| RANCHO VISTA | Substation-Adjacent | CA | Orange County | 500 kV | 1,000 MW | 7.6 yrs | 58.8 |
| Amazon San Bernardino | Brownfield | CA | Orange County | 500 kV | 1 MW | 7.6 yrs | 57.2 |
| Tequesquite Landfill | Brownfield | CA | Riverside | 66 kV | 8 MW | 7.6 yrs | 57.0 |
| CENTURY | Substation-Adjacent | CA | Orange County | 287 kV | 300 MW | 7.6 yrs | 56.0 |
How does LAKEVIEW compare with other substations in California?
California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 697 named substations in the state are in LAKEVIEW's 115–229 kV band (23% of named stations). 428 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.
How do candidate sites near LAKEVIEW score?
The 8 highest-scoring candidate sites within about 25 miles range from 56 to 62 on the 0–100 DC Readiness scale. They fall in Orange County, Riverside. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is LAKEVIEW substation?
LAKEVIEW has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so LAKEVIEW is at the national midpoint.
How many transmission lines connect to LAKEVIEW substation?
0 transmission lines terminate at or pass through LAKEVIEW in the HIFLD line data.
Where is LAKEVIEW substation located?
LAKEVIEW is in California at 33.8257, -117.1340. The datacenter candidate sites closest to it are in Orange County, Riverside.
Are there datacenter candidate sites near LAKEVIEW substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of LAKEVIEW. The highest-scoring is VALLEY at 62/100. Across California, the average DC Readiness score is 45.4.
Other 115 kV substations in California
- SANGER· 11 lines
- COLTON (CENTURY)· 10 lines
- MANTECA· 10 lines
- EAST NICOLAUS· 9 lines
- HERNDON· 9 lines
- AMES· 8 lines
- BAYSHORE· 8 lines
- CALECTRIC· 8 lines
- All named substations in California· 3,003 stations
- Datacenter candidate sites in California· 8,490 sites
- Brownfield and retired plant sites in California
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “LAKEVIEW substation, California”, https://gridcensus.com/substations/california/lakeview-98b70be9 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for LAKEVIEW substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.