GEYSERS TAP 1

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

At a glance

GEYSERS TAP 1 is a 230 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. 44 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OAKMONT SOUTH in Napa County, with a DC Readiness score of 55/100.

GEYSERS TAP 1 is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates38.7543, -122.7544

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#301564230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE19.0 mi
#308205230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.1 mi
#309409230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE39.7 mi
#311704230 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE1.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GEYSERS TAP 1, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GEYSERS TAP 1 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OAKMONT SOUTHSubstation-AdjacentCANapa County230 kV300 MW7.6 yrs55.0
OAKMONT NORTHSubstation-AdjacentCANapa County230 kV300 MW7.6 yrs54.9
FULTONSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs54.3
SOCRATES 19Substation-AdjacentCASonoma County230 kV300 MW7.6 yrs53.3
WEST FORD FLATSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs52.9
BEAR CANYONSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs52.6
BIG GEYSERSSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs51.9
QUICKSILVERSubstation-AdjacentCASonoma County230 kV300 MW7.6 yrs51.9

How does GEYSERS TAP 1 compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 384 named substations in the state are in GEYSERS TAP 1's 230–344 kV band (13% of named stations). 44 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at GEYSERS TAP 1?

The 4 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 230 kV to 230 kV. Their combined recorded length is about 61.6 miles.

How do candidate sites near GEYSERS TAP 1 score?

The 8 highest-scoring candidate sites within about 25 miles range from 52 to 55 on the 0–100 DC Readiness scale. They fall in Napa County, Sonoma County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is GEYSERS TAP 1 substation?

GEYSERS TAP 1 has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so GEYSERS TAP 1 is above the national midpoint.

How many transmission lines connect to GEYSERS TAP 1 substation?

3 transmission lines terminate at or pass through GEYSERS TAP 1 in the HIFLD line data. The connected lines listed here run at 230 kV. Together the listed lines cover about 61.6 miles.

Who owns GEYSERS TAP 1 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at GEYSERS TAP 1 belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is GEYSERS TAP 1 substation located?

GEYSERS TAP 1 is in California at 38.7543, -122.7544. The datacenter candidate sites closest to it are in Napa County, Sonoma County.

Are there datacenter candidate sites near GEYSERS TAP 1 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of GEYSERS TAP 1. The highest-scoring is OAKMONT SOUTH at 55/100. Across California, the average DC Readiness score is 45.4.

Other 230 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “GEYSERS TAP 1 substation, California”, https://gridcensus.com/substations/california/geysers-tap-1-42686f01 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for GEYSERS TAP 1 substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.