At a glance

FAYETTE ENERGY CORP is a 230 kV electric substation in California, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. 44 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is TESLA Power Project in Alameda County, with a DC Readiness score of 67/100.

FAYETTE ENERGY CORP is an electric transmission substation in California. It is classified as high-voltage (230 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines0

Ownership

No owner is recorded for the lines that connect here.

Coordinates37.7474, -121.5984

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FAYETTE ENERGY CORP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FAYETTE ENERGY CORP substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfieldCAAlameda County500 kV1,322 MW7.6 yrs66.5
NEWARK DISTRIBUTIONSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs59.3
TESLASubstation-AdjacentCAAlameda County500 kV1,000 MW7.6 yrs59.2
TRACYSubstation-AdjacentCASan Joaquin County500 kV1,000 MW7.6 yrs58.6
LOS ESTEROSSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs58.6
FREMONTSubstation-AdjacentCAAlameda County230 kV300 MW7.6 yrs58.4
COUNTRY CLUBSubstation-AdjacentCASan Joaquin County230 kV300 MW7.6 yrs57.6
SC 1 Data Center, Phase 2BrownfieldCASanta Clara County60 kV2 MW7.6 yrs57.3

How does FAYETTE ENERGY CORP compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 384 named substations in the state are in FAYETTE ENERGY CORP's 230–344 kV band (13% of named stations). 44 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

How do candidate sites near FAYETTE ENERGY CORP score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 67 on the 0–100 DC Readiness scale. They fall in Alameda County, San Joaquin County, Santa Clara County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is FAYETTE ENERGY CORP substation?

FAYETTE ENERGY CORP has a maximum voltage of 230 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so FAYETTE ENERGY CORP is above the national midpoint.

How many transmission lines connect to FAYETTE ENERGY CORP substation?

0 transmission lines terminate at or pass through FAYETTE ENERGY CORP in the HIFLD line data.

Where is FAYETTE ENERGY CORP substation located?

FAYETTE ENERGY CORP is in California at 37.7474, -121.5984. The datacenter candidate sites closest to it are in Alameda County, San Joaquin County, Santa Clara County.

Are there datacenter candidate sites near FAYETTE ENERGY CORP substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of FAYETTE ENERGY CORP. The highest-scoring is TESLA Power Project at 67/100. Across California, the average DC Readiness score is 45.4.

Other 230 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “FAYETTE ENERGY CORP substation, California”, https://gridcensus.com/substations/california/fayette-energy-corp-f5d9e4ba (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for FAYETTE ENERGY CORP substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.