At a glance

EASTGATE is a 69 kV electric substation in California on SAN DIEGO GAS & ELECTRIC's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 1,125 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is MIGUEL in San Diego County, with a DC Readiness score of 61/100.

EASTGATE is an electric transmission substation in California, on SAN DIEGO GAS & ELECTRIC's transmission network. It is classified as distribution (69–115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines4

Ownership

Line owner (most lines)SAN DIEGO GAS & ELECTRIC
Coordinates32.8848, -117.2008

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30250469 kVSAN DIEGO GAS & ELECTRIC—8.3 mi
#30386669 kVSAN DIEGO GAS & ELECTRICIN SERVICE5.0 mi
#30704069 kVSAN DIEGO GAS & ELECTRIC—8.5 mi
#31284169 kVSAN DIEGO GAS & ELECTRICIN SERVICE2.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EASTGATE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EASTGATE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIGUELSubstation-AdjacentCASan Diego County500 kV1,000 MW7.6 yrs60.6
PENASQUITOSSubstation-AdjacentCASan Diego County230 kV300 MW7.6 yrs57.7
FRIARSSubstation-AdjacentCASan Diego County230 kV300 MW7.6 yrs57.6
MISSIONSubstation-AdjacentCASan Diego County230 kV300 MW7.6 yrs57.6
OLD TOWNSubstation-AdjacentCASan Diego County230 kV300 MW7.6 yrs57.4
STATION FSubstation-AdjacentCASan Diego County230 kV300 MW7.6 yrs57.4
CALPEAK PE 7Substation-AdjacentCASan Diego County230 kV300 MW7.6 yrs57.1
ENCINASubstation-AdjacentCASan Diego County230 kV300 MW7.6 yrs56.8

How does EASTGATE compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 379 named substations in the state are in EASTGATE's 69–114 kV band (13% of named stations). 1,125 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at EASTGATE?

The 4 connected lines listed above are owned by SAN DIEGO GAS & ELECTRIC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 24.5 miles.

How do candidate sites near EASTGATE score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 61 on the 0–100 DC Readiness scale. They fall in San Diego County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is EASTGATE substation?

EASTGATE has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so EASTGATE is below the national midpoint.

How many transmission lines connect to EASTGATE substation?

4 transmission lines terminate at or pass through EASTGATE in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 24.5 miles.

Who owns EASTGATE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at EASTGATE belong to SAN DIEGO GAS & ELECTRIC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is EASTGATE substation located?

EASTGATE is in California at 32.8848, -117.2008. The datacenter candidate sites closest to it are in San Diego County.

Are there datacenter candidate sites near EASTGATE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of EASTGATE. The highest-scoring is MIGUEL at 61/100. Across California, the average DC Readiness score is 45.4.

Other 69 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EASTGATE substation, California”, https://gridcensus.com/substations/california/eastgate-faafd4b7 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for EASTGATE substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.