Skip to content
Gridcensus

COUNTRY CLUB

Substation

California · PACIFIC GAS & ELECTRIC COMPANY

Max voltage
230
kV

At a glance

COUNTRY CLUB is a 230 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 44 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is TESLA Power Project in Alameda County, with a DC Readiness score of 67/100.

COUNTRY CLUB is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage60 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates37.9792, -121.3164

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30233960 kVPACIFIC GAS & ELECTRIC COMPANY—2.5 mi
#30623460 kVPACIFIC GAS & ELECTRIC COMPANY—2.5 mi
#30953160 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE3.2 mi
#31202760 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COUNTRY CLUB, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COUNTRY CLUB substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TESLA Power ProjectBrownfieldCAAlameda County500 kV1,322 MW7.6 yrs66.5
TESLASubstation-AdjacentCAAlameda County500 kV1,000 MW7.6 yrs59.2
TRACYSubstation-AdjacentCASan Joaquin County500 kV1,000 MW7.6 yrs58.6
COUNTRY CLUBSubstation-AdjacentCASan Joaquin County230 kV300 MW7.6 yrs57.6
PRESCOTTSubstation-AdjacentCAStanislaus County230 kV300 MW7.6 yrs57.1
ROSEMORE BSubstation-AdjacentCAStanislaus County230 kV300 MW7.6 yrs57.0
STAGGSubstation-AdjacentCASan Joaquin County230 kV300 MW7.6 yrs56.6
WEBERSubstation-AdjacentCASan Joaquin County230 kV300 MW7.6 yrs56.5

How does COUNTRY CLUB compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 384 named substations in the state are in COUNTRY CLUB's 230–344 kV band (13% of named stations). 44 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at COUNTRY CLUB?

The 4 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 60 kV. Their combined recorded length is about 10.3 miles.

How do candidate sites near COUNTRY CLUB score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 67 on the 0–100 DC Readiness scale. They fall in Alameda County, San Joaquin County, Stanislaus County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is COUNTRY CLUB substation?

COUNTRY CLUB has a maximum voltage of 230 kV and a minimum of 60 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so COUNTRY CLUB is above the national midpoint.

How many transmission lines connect to COUNTRY CLUB substation?

4 transmission lines terminate at or pass through COUNTRY CLUB in the HIFLD line data. The connected lines listed here run at 60 kV. Together the listed lines cover about 10.3 miles.

Who owns COUNTRY CLUB substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at COUNTRY CLUB belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is COUNTRY CLUB substation located?

COUNTRY CLUB is in California at 37.9792, -121.3164. The datacenter candidate sites closest to it are in Alameda County, San Joaquin County, Stanislaus County.

Are there datacenter candidate sites near COUNTRY CLUB substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of COUNTRY CLUB. The highest-scoring is TESLA Power Project at 67/100. Across California, the average DC Readiness score is 45.4.

Other 230 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “COUNTRY CLUB substation, California”, https://gridcensus.com/substations/california/country-club-4cbd980a (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for COUNTRY CLUB substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.