At a glance

COLEMAN is a 69 kV electric substation in California on PACIFIC GAS & ELECTRIC COMPANY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. 1,125 of California's 3,003 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OLINDA in Tehama County, with a DC Readiness score of 55/100.

COLEMAN is an electric transmission substation in California, on PACIFIC GAS & ELECTRIC COMPANY's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)PACIFIC GAS & ELECTRIC COMPANY
Coordinates40.4050, -122.1217

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30595160 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE8.4 mi
#30915760 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE8.6 mi
#31151660 kVPACIFIC GAS & ELECTRIC COMPANYIN SERVICE11.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COLEMAN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COLEMAN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OLINDASubstation-AdjacentCATehama County500 kV1,000 MW7.6 yrs54.5
FLANNIGANSubstation-AdjacentCAShasta County230 kV300 MW7.6 yrs50.7
SHASTASubstation-AdjacentCAShasta County230 kV300 MW7.6 yrs50.7
KESWICKSubstation-AdjacentCAShasta County230 kV300 MW7.6 yrs50.6
SPRING CREEKSubstation-AdjacentCAShasta County230 kV300 MW7.6 yrs50.5
AIRPORTSubstation-AdjacentCAShasta County230 kV300 MW7.6 yrs50.4
COTTONWOODSubstation-AdjacentCATehama County230 kV300 MW7.6 yrs50.4
Sierra Pacific Anderson FacilityBrownfieldCATehama County115 kV4 MW7.6 yrs50.1

How does COLEMAN compare with other substations in California?

California has 4,260 substation records in HIFLD, of which 3,003 carry a station name; the rest are unnamed tap points, risers and line ends. 379 named substations in the state are in COLEMAN's 69–114 kV band (13% of named stations). 1,125 sit in a higher band. 44 named substations in California operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at COLEMAN?

The 3 connected lines listed above are owned by PACIFIC GAS & ELECTRIC COMPANY. Line voltages range from 60 kV to 60 kV. Their combined recorded length is about 28 miles.

How do candidate sites near COLEMAN score?

The 8 highest-scoring candidate sites within about 25 miles range from 50 to 55 on the 0–100 DC Readiness scale. They fall in Tehama County, Shasta County. The California average across 8,490 scored sites is 45.4. 1,573 of those California sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is COLEMAN substation?

COLEMAN has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so COLEMAN is below the national midpoint.

How many transmission lines connect to COLEMAN substation?

3 transmission lines terminate at or pass through COLEMAN in the HIFLD line data. The connected lines listed here run at 60 kV. Together the listed lines cover about 28 miles.

Who owns COLEMAN substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at COLEMAN belong to PACIFIC GAS & ELECTRIC COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is COLEMAN substation located?

COLEMAN is in California at 40.4050, -122.1217. The datacenter candidate sites closest to it are in Tehama County, Shasta County.

Are there datacenter candidate sites near COLEMAN substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of COLEMAN. The highest-scoring is OLINDA at 55/100. Across California, the average DC Readiness score is 45.4.

Other 69 kV substations in California

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “COLEMAN substation, California”, https://gridcensus.com/substations/california/coleman-bac8d402 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for COLEMAN substation, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.