At a glance

ROGERS is a 230 kV electric substation in Arizona on SALT RIVER PROJECT's transmission network, recorded in the HIFLD transmission dataset. 7 transmission lines connect to it. 47 of Arizona's 466 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is Copper Crossing Energy and Research Cent in Pinal County, with a DC Readiness score of 70/100.

ROGERS is an electric transmission substation in Arizona, on SALT RIVER PROJECT's transmission network. It is classified as high-voltage (230 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage69 kV
Voltage classHigh-voltage (230 kV)
Connected lines7

Ownership

Line owner (most lines)SALT RIVER PROJECT
StateArizona
Coordinates33.4250, -111.7998

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#304966230 kVSALT RIVER PROJECTIN SERVICE7.6 mi
#312375230 kV—IN SERVICE22.0 mi
#312597230 kV—IN SERVICE22.0 mi
#302107230 kVSALT RIVER PROJECTIN SERVICE7.2 mi
#31196069 kVSALT RIVER PROJECT—1.0 mi
#30533969 kVSALT RIVER PROJECT—2.5 mi
#31218969 kVSALT RIVER PROJECT—1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROGERS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROGERS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Copper Crossing Energy and Research CentBrownfieldAZPinal County69 kV1,779 MW3.5 yrs69.5
KYRENESubstation-AdjacentAZMaricopa County500 kV1,000 MW3.5 yrs66.0
BROWNINGSubstation-AdjacentAZPinal County500 kV1,000 MW3.5 yrs65.7
PINNACLE PEAK APSSubstation-AdjacentAZMaricopa County500 kV1,000 MW3.5 yrs64.7
WARDSubstation-AdjacentAZMaricopa County230 kV300 MW3.5 yrs63.3
EC Near CrosscutGreenfieldAZMaricopa——3.5 yrs63.2
ABELSubstation-AdjacentAZPinal County500 kV1,000 MW3.5 yrs63.0
OZ MaricopaGreenfieldAZMaricopa——3.5 yrs62.9

How does ROGERS compare with other substations in Arizona?

Arizona has 892 substation records in HIFLD, of which 466 carry a station name; the rest are unnamed tap points, risers and line ends. 91 named substations in the state are in ROGERS's 230–344 kV band (20% of named stations). 47 sit in a higher band. 47 named substations in Arizona operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 69 kV.

Who owns the transmission lines at ROGERS?

The 7 connected lines listed above are owned by SALT RIVER PROJECT. Line voltages range from 69 kV to 230 kV. Their combined recorded length is about 63.4 miles.

How do candidate sites near ROGERS score?

The 8 highest-scoring candidate sites within about 25 miles range from 63 to 70 on the 0–100 DC Readiness scale. They fall in Pinal County, Maricopa County, Maricopa. The Arizona average across 3,816 scored sites is 48.5. 614 of those Arizona sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is ROGERS substation?

ROGERS has a maximum voltage of 230 kV and a minimum of 69 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so ROGERS is above the national midpoint.

How many transmission lines connect to ROGERS substation?

7 transmission lines terminate at or pass through ROGERS in the HIFLD line data. The connected lines listed here run at 230 kV, 69 kV. Together the listed lines cover about 63.4 miles.

Who owns ROGERS substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at ROGERS belong to SALT RIVER PROJECT. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is ROGERS substation located?

ROGERS is in Arizona at 33.4250, -111.7998. The datacenter candidate sites closest to it are in Pinal County, Maricopa County, Maricopa.

Are there datacenter candidate sites near ROGERS substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ROGERS. The highest-scoring is Copper Crossing Energy and Research Cent at 70/100. Across Arizona, the average DC Readiness score is 48.5.

Other 230 kV substations in Arizona

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ROGERS substation, Arizona”, https://gridcensus.com/substations/arizona/rogers-b5604347 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ROGERS substation, Arizona is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.