ABEL is a substation-adjacent datacenter candidate site in Pinal County, Arizona, interconnecting through WECC. It screens at 59.9/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationABEL
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPEdgeCore Phoenix
IXP distance16.1 mi
Fiber providers15
Fiber coverage54.0%

Site characteristics

Risk & environment

Water stress (WRI)Extremely High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterApple Mesa Data Center
DC distance15.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (property_tax_reduction)
Commercial electricity13.27¢/kWh
Industrial electricity10.78¢/kWh
Cooling degree days3,400
Heating degree days1,500
Land price / acre$2,148

Incentive detail: Government Property Lease Excise Tax (GPLET) for qualified facilities on government land.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
44
Fiber connectivity12%
57
Energy cost10%
50
Water risk8%
16
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
52
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Pinal County, ranked by DC Readiness.

Sites near ABEL
SiteTypeVoltageCapacityQueue waitScore
Copper Crossing Energy and Research CentBrownfield69 kV1,779 MW5.7 yrs67.6
BROWNINGSubstation-Adjacent500 kV1,000 MW6.9 yrs64.6
SCHRADERSubstation-Adjacent230 kV300 MW6.9 yrs59.0
SAGUAROSubstation-Adjacent500 kV1,000 MW6.9 yrs59.0
SANTANSubstation-Adjacent230 kV300 MW6.9 yrs58.7
DUKESubstation-Adjacent500 kV1,000 MW6.9 yrs58.6
EC Pinal Coal AreaGreenfield5.7 yrs58.4
THUNDERSTONESubstation-Adjacent230 kV300 MW6.9 yrs58.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ABEL, Pinal County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.