EC Near WPPI Hartford DG

Greenfield

Washington, Wisconsin · MISO

DC Readiness
55.2
Good / 100

At a glance

EC Near WPPI Hartford DG is a greenfield datacenter candidate site in Washington, Wisconsin, scoring 55.2/100 DC Readiness — 35th of 92 scored sites in the county. It sits in the MISO grid region and the WISCONSIN ELECTRIC POWER CO service territory, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.13¢/kWh
UtilityWISCONSIN ELECTRIC POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWVery Large Customer (VLC) tariff · 10 yr

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEthoplex Data Center
IXP distance17.9 mi
Fiber providers7
Fiber coverage27.8%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance105.9 mi

Site characteristics

Site typeGreenfield
Land contactWashington County Assessor
Land owner typeprivate
Buildability50.0/100
Former usenear retired oil plant (10km)

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenterEthoplex Data Center
DC distance17.9 mi
Nearest rail4.9 mi
Nearest gas pipeline13.2 mi
Nearest fiber route40.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.21¢/kWh
Industrial electricity9.16¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$9,471

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near WPPI Hartford DG

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near WPPI Hartford DG compare with other sites in Washington?

EC Near WPPI Hartford DG ranks 35th of 92 scored candidate sites in Washington. Its 55.2/100 is roughly in line with the county average of 55.7. It is roughly in line with the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.

Against the Wisconsin average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is fiber connectivity (45 vs 67). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near WPPI Hartford DG to power, fiber and other datacenters?

The nearest located transmission bottleneck is WEC34101_SUSSEX_36341_1 (MISO), 17 miles away. For connectivity, the nearest internet exchange facility is Ethoplex Data Center at 17.9 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Ethoplex Data Center, 17.9 miles away.

What are the flood, water and hazard risks at EC Near WPPI Hartford DG?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). WRI rates baseline water stress at 0.30 on a 0–5 scale. No mapped wetlands are recorded on the parcel. At the county level, FEMA's National Risk Index rates Washington "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
45
Energy cost10%
84
Water risk7%
94
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
65
Land / acreage3%
45
Construction cost3%
67
Gas pipeline2%
58
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Washington, ranked by DC Readiness.

Sites near EC Near WPPI Hartford DG
SiteTypeVoltageCapacityQueue waitScore
TAP138061Substation-Adjacent345 kV600 MW4.3 yrs66.4
EC Near Omega Hills Gas RecoveryGreenfield——4.3 yrs64.2
EC Near Omega Hills Gas RecoveryGreenfield——4.3 yrs63.2
EC Near WPPI Hartford DGGreenfield——4.3 yrs62.9
GERMANTOWN SW YDSubstation-Adjacent138 kV100 MW4.3 yrs62.4
68TH STREETSubstation-Adjacent138 kV100 MW4.3 yrs61.0
PLEASANT VALLEYSubstation-Adjacent138 kV100 MW4.3 yrs60.9
CEDARBURG SOUTHSubstation-Adjacent138 kV100 MW4.3 yrs60.9

EC Near WPPI Hartford DG: common questions

What is the DC Readiness score of EC Near WPPI Hartford DG?

EC Near WPPI Hartford DG scores 55.2/100 on the GridCensus DC Readiness scale, rated good. It ranks 35th of 92 scored sites in Washington. The Washington average is 55.7 and the Wisconsin average is 55.4.

Which electric utility serves EC Near WPPI Hartford DG?

WISCONSIN ELECTRIC POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is WISCONSIN ENERGY CORP.

What grid region is EC Near WPPI Hartford DG in?

EC Near WPPI Hartford DG is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near WPPI Hartford DG in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

Who owns EC Near WPPI Hartford DG?

Parcel records list the owner as Neosho Sportsmens Club (private land).

How far is EC Near WPPI Hartford DG from an internet exchange?

The nearest internet exchange facility is Ethoplex Data Center, about 17.9 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near WPPI Hartford DG, Washington, WI”, https://gridcensus.com/datacenter-sites/wisconsin/washington/ec-near-wppi-hartford-dg-800097b9 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near WPPI Hartford DG, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.