68TH STREET
Substation-AdjacentWashington, Wisconsin · MISO
68TH STREET is a substation-adjacent datacenter candidate site in Washington, Wisconsin, interconnecting through MISO. It screens at 60.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Washington, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 66.3 |
| TAP138061 | Substation-Adjacent | 345 kV | 600 MW | 2.8 yrs | 65.5 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 65.3 |
| EC Near WPPI Hartford DG | Greenfield | — | — | 1.4 yrs | 64.9 |
| GERMANTOWN SW YD | Substation-Adjacent | 138 kV | 100 MW | 2.8 yrs | 62.7 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 62.3 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 61.8 |
| EC Near Omega Hills Gas Recovery | Greenfield | — | — | 1.4 yrs | 61.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for 68TH STREET, Washington. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.