Skip to content
Gridcensus

EC Near Genoa

Greenfield

Vernon, Wisconsin · MISO

DC Readiness
52.2
Fair / 100

At a glance

EC Near Genoa is a greenfield datacenter candidate site in Vernon, Wisconsin, scoring 52.2/100 DC Readiness — 36th of 41 scored sites in the county. It sits in the MISO grid region, where interconnection has averaged 4.3 years from request to operation.

Power & interconnection

LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth133
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPSFN MN-Rochester
IXP distance72.3 mi
Fiber providers6
Fiber coverage95.2%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance145.1 mi

Site characteristics

Site typeGreenfield
Land contactVernon County Assessor
Land owner typeprivate
Buildability5.0/100
Land cover (NLCD)Water
Former usenear retired coal plant (10km)

Risk & environment

Environmental constraintModerate (40/100)
Flood zoneZone AE (SFHA)
Water stress (WRI)0.30
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score53/100
Construction cost index99.4 (avg 100)

Location context

Nearest datacenterNP Rochester
DC distance72.3 mi
Nearest rail1.8 mi
Nearest gas pipeline14.9 mi
Nearest fiber route96.6 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.41¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,236

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track EC Near Genoa

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does EC Near Genoa compare with other sites in Vernon?

EC Near Genoa ranks 36th of 41 scored candidate sites in Vernon. Its 52.2/100 is roughly in line with the county average of 55.3. It is roughly in line with the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.

Against the Wisconsin average, its strongest sub-score is fiber connectivity (74 vs 67) and its weakest is natural hazard (53 vs 77). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is EC Near Genoa to power, fiber and other datacenters?

For connectivity, the nearest internet exchange facility is SFN MN-Rochester at 72.3 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is NP Rochester, 72.3 miles away.

What are the flood, water and hazard risks at EC Near Genoa?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding. WRI rates baseline water stress at 0.30 on a 0–5 scale. Mapped wetlands (National Wetlands Inventory) are present on the parcel. At the county level, FEMA's National Risk Index rates Vernon "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
74
Energy cost10%
85
Water risk7%
90
Natural hazard6%
53
Buildability7%
5
Labor market4%
50
DC cluster4%
25
Land / acreage3%
45
Construction cost3%
67
Gas pipeline2%
52
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Vernon, ranked by DC Readiness.

Sites near EC Near Genoa
SiteTypeVoltageCapacityQueue waitScore
EC Coal Vernon CountyGreenfield——4.3 yrs59.7
EC Coal Vernon CountyGreenfield——4.3 yrs59.5
EC Near GenoaGreenfield——4.3 yrs59.2
EC Coal Vernon CountyGreenfield——4.3 yrs59.2
UNKNOWN159041Substation-Adjacent161 kV100 MW4.3 yrs58.0
EC Near GenoaGreenfield——4.3 yrs57.6
EC Near GenoaGreenfield——4.3 yrs57.4
OZ VernonGreenfield——4.3 yrs57.3

EC Near Genoa: common questions

What is the DC Readiness score of EC Near Genoa?

EC Near Genoa scores 52.2/100 on the GridCensus DC Readiness scale, rated fair. It ranks 36th of 41 scored sites in Vernon. The Vernon average is 55.3 and the Wisconsin average is 55.4.

What grid region is EC Near Genoa in?

EC Near Genoa is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.

Is EC Near Genoa in a flood zone?

The site is in FEMA flood zone AE, a Special Flood Hazard Area — land with at least a 1% annual chance of flooding.

Who owns EC Near Genoa?

Parcel records list the owner as AMERICAN TRANSMISSION CO (private land).

How far is EC Near Genoa from an internet exchange?

The nearest internet exchange facility is SFN MN-Rochester, about 72.3 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EC Near Genoa, Vernon, WI”, https://gridcensus.com/datacenter-sites/wisconsin/vernon/ec-near-genoa-45ecc238 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for EC Near Genoa, Vernon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.